Laserfiche WebLink
TABLE 1 <br /> Soil Boring and Well Construction Details <br /> Stockton Charter Way Commingled Plume <br /> 440,441, and 508 West Charter Way and 1444 South Lincoln Street, Stockton, CA <br /> Borehole Casing Screened Filter Pack Bentonite Seal Cement Seal Water. <br /> Installed -I:bepth Casing Slot Size Interval Interval Interval Interval Bearing Comments <br /> Location I.D. Diameter Diameter Date ;:'bgs) Material (inches) <br /> -.(inches inches ) (feet b s) (feet b s (feet s) (feet b 9) Zone. <br /> AMW-86 081090 .44$ -90 16ie 2 SCH.40 PVC 0.020 75-90 72-90 45-72 045 C <br /> AMW-8C 08/03/0 .752 120 16/8 2 SCH.40 PVC 0.020 105-120 102-120 45-102 0-45 D <br /> AMW-9 11/15/0 .086 32.5 8 2 SCH.40 PVC 0.020 17-32 15-32.5 12-15 0-12 A <br /> AMW-10 11/16/05712.171 32.5 8 2 SCH.40 PVC 0.020 17-32 15-32.5 12-15 0-12 A <br /> AMW-11 11/14/0 .546 32 8 2 SCH.40 PVC 0.020 17-32 15-32 12-15 0-12 A <br /> AMW-12 11/15/0 .772 32.5 8 2 SCH.40 PVC 0.020 17-32 1 15-32.5 1 12-15 1 0-12 A <br /> Vapor Wells(VW) <br /> VW-1 05/06/92 14.890 41 10 4 SCH.40 PVC 0.10 1540 13-40 11-13 0-11 A&B installed in B-9 <br /> VN-2 05107/92 - 40 10 4 SCH,40 PVC 0.10 15-40 1440 12-14 0-12 A88 installed in B-10,destroyed 10/3/05 <br /> VW-3 05107/92 - 40 10 4 SCH.40 PVC 0.10 1540 14-41 12-14 0-12 A8B installed in B-11,destroyed 10/3/05 <br /> VW4 01/11/93 - 41 8.25 4 SCH.40 PVC 0.10 5-25 4-25 2-4,25-26 0-2 A installed in B-14,destroyed 10/3/05 <br /> VW-5 01/12/93 - 26 8.25 4 SCH.40 PVC 0.10 6-26 4-26 24 0.2 A installed in B-17,destroyed 10/3/05 <br /> VW-6 01/13/93 - 40 8.25 4 SCH.40 PVC 0.10 9.5-29.5 8.540 6.5-8.5 0-6.5 A installed in B-18 <br /> VW-7 01/13/93 14.627 41 8.25 4 SCH.40 PVC 0.10 17-27 16-27,28-39 13-16.27-28,39-41 0-13 A installed in B-19 <br /> VIN-8 05/12/95 12.797 26.5 8 4 SCH.40 PVC 0.10 10.8-24.8 7.5-25.7 4.5-7.5,25.7-26.5 04.5 A <br /> VW-9 05/12/95 - 26.5 8 4 SCH.40 PVC 0.10 6.2-20.3 5.2-21,23526.5 3.8-5.2,21-23.5 0-3.8 A destroyed 10/3/05 <br /> VW-10 07/2456 12.930 26 8 4 SCH.40 PVC 0.01 6-25.5 5-26 3-5 0-3 A installed in B-25 <br /> VW-11 07/24/96 13.750 26 10 4 SCH.40 PVC 0.01 6-25.5 5-26 3-5 0-3 A installed in B-24 <br /> VW-12 07/2456 - 26 10 4 SCH.40 PVC 0.01 6-25.5 5.26 3-5 0-3 A installed in B-23,destroyed 10/3/05 <br /> VW-13 1 072456 - 26 10 4 SCH.40 PVC 0.01 6-25.5 5-26 3-5 0-3 A installed in B-22,destroyed 10/3/05 <br /> Extraction Wells(EW) <br /> EW-1 11/03/05 11.231 41 10 2 SCH.80 PVC 0.020 15-25 12-26,33-39 10-12,26-33,3941 0-10 A <br /> EW-2 11103/05 12.068 39 10 2 SCH.80 PVC 0.020 15-25 12-26,33-39 10-12,26-33 0-10 A <br /> EW-3 11/04/05 11.698 39 10 2 SCH,80 PVC 0.020 15-25 12-26,33-39 10-12,26-33 0-10 A <br /> EW-4 11/11/05 12.065 37 10 2 SCH.80 PVC 0.020 15-25 12-26,29-33.5 10-12,26-29,33.5-37 0-10 A <br /> EW-5 11104105 12.291 39 10 2 SCH.80 PVC 0.020 15-25 12-26,30-33.5 10-12,26-30,33.5-39 0-10 A <br /> EW-6 11/10105 12.283 37 10 2 SCH.80 PVC 0.020 15-25 12-26,30-34 10-12,26-30.3437 0-10 A <br /> EW-7 11/10105 11.980 37 10 2 SCH.80 PVC 0.020 15-25 12-26,30-34 10-12,26-30,34-37 0-10 A <br /> EW-8 11/08/05 11.837 39 10 2 SCH.80 PVC 0.020 15-25 12-26,31-36 10-12.26-31,36-39 0-10 A <br /> EW-9 11/11/05 12.160 37 10 2 SCH.80 PVC 0.020 15-25 12-26,30.5-35 10-12,26-30.5,35-37 0-10 A <br /> EW-10 11/14/05 12.083 37 10 2 SCH.80 PVC 0.020 15-25 12-26,31-35 10-12.26-31,35-37 0-10 A <br /> EW-11 11107105 13.238 37 10 2 SCH.80 PVC 0.020 1525 12-26,30-33.5 10-12,26-30,33.5-37 0-10 A <br /> EW-12 11/07/05 14.893 37 10 2 SCH.80 PVC 0.020 15-25 12-26,30-34 10-12,26-30,34-37 0-10 A <br /> EW-13 11/08105 14.777 37 10 2 SCH.80 PVC 0.020 15-25 12-26,30-34 10-12,26-30,34-37 0-10 A <br /> EW-14 11109/05 13.643 37 10 2 SCH.80 PVC 0.020 15-25 12-26,31-3&5 10-12,26-31,35.5-37 0-10 A <br /> EW-15 11/15105 12.331 37 10 2 SCH.80 PVC 0.020 15-25 12-26,31-34.5 10-12,26-31,34.5-37 0-10 A <br /> EW-16 11/15105 12.234 39 10 2 SCH.80 PVC 0.020 15-25 12-26.34-39 10-12,26-34 0.10 A <br /> EW-17 11/15105 12.197 41 10 2 SCH.80 PVC 0.020 15-25 12-26,35-3&5 10-12,26-35,38.541 0-10 A <br /> parge Wells(SP) <br /> SP-1 1 11/0355 11.231 41 1 10 1 SCH,80 PVC 0 020 1 36-38 1 12-26,33-39 1 10-12.2"3.39-41 0-10 8 <br /> Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xis Page 2 of 7 Stantec <br />