Laserfiche WebLink
TABLE 1 <br /> Soil Boring and Well Construction Details <br /> Stockton Charter Way Commingled Plume <br /> 440,441, and 508 West Charter Way and 1444 South Lincoln Street, Stockton, CA <br /> TOC <br /> Location I.D. InsBorehoIG Casing Screened Filter Pack Bentonite Seal Cement Seal Water- <br /> Date <br /> Date Elevation Total D-�epth Casing Slot Size <br /> Diameter Diameter Interval Interval Interval Interval Bearing Comments <br /> (feet ( '- Material (inches) <br /> (inches) (Inches) (feet b s) ((set beat feet a) (feet b s) Zane <br /> SP-2 11/03105 12.068 39 10 1 SCH.80 PVC 0 020 36-38 12-26,33-39 10-12,26-33 0-10 B <br /> SP-3 11/04/05 11.698 39 10 1 SCH.80 PVC 0 020 36-38 12-26,33-39 10-12,26-33 0-10 B <br /> SP4 11/11/05 12.065 37 10 1 SCH.80 PVC 0.020 31-33 12-26.29-33.5 10-12.26-29,33.5-37 0-10 A <br /> SP-5 11/04/05 12.291 39 10 1 SCH.80 PVC 0.020 31-33 12-26,30.33.5 10-12,26-30,33.539 0-10 A <br /> SP-0 11/10/05 12.283 37 10 1 SCH.60 PVC 0.020 31-33 12-26,30-34 10-12,26-30,34-37 0-10 A <br /> SP-7 11/10/05 11.980 37 10 1 SCH.80 PVC 0.020 31-33 12-26,30-34 1012,26-30,3437 0-10 A <br /> SP$ 11/08/05 11.837 39 10 1 SCH.80 PVC 0.020 33-35 12-26,31-36 10-12,26-31,3639 0-10 A <br /> SP-9 11/11/05 12.160 37 10 1 SCH.80 PVC 0.020 325-34.5 12-26,30.5-35 10-12,26-30.5,35-37 0-10 A <br /> SP-10 11/14/05 12.083 37 10 1 SCH.80 PVC 0.020 3234 12-26,31-35 10-12,26-31,35-37 0-10 A <br /> SP-11 11/07/05 13.238 37 10 1 SCH,80 PVC 0.020 31-33 12-26,30-33.5 10-12,26-30,33.5-37 0-10 A <br /> SP-12 11/07/05 14.893 37 10 1 SCH.80 PVC 0.020 31-33 12-26,30-34 1612,26-30,3437 010 A <br /> SP-13 11/08/05 14.777 37 10 1 SCH.80 PVC 0.020 31-33 12-26,30-34 1612,26-30,34-37 0-10 A <br /> SP-14 11/09/05 13,643 37 10 1 SCH.80 PVC 0.020 33-35 12-26.31-35.5 10-12,26-31,35.5-37 D-10 B <br /> SP-15 11115/05 12.331 37 10 1 SCH.80 PVC 0.020 32-34 12-26.31-34.5 10-12,26-31.34.5-37 0-10 A <br /> SP-16 11/15/05 12.234 39 10 1 SCH.80 PVC 0.020 36-38 12-26,3439 10-12,25-34 0-10 A <br /> SP-17 11/15/05 12.197 41 10 1 SCH.80 PVC 0.020 3638 12-26,35-38.5 10-12,26-35.38 5.41 0-10 A <br /> SP-18 11/10/06 12.273 37 8 1 SCH.80 PVC 0.020 32-34 3034.5 27-30,34.5-37 0-27 A <br /> SP-19 11/04/05 12.930 37 8 1 SCH.80 PVC 0.020 31-33 30-33.5 2630,33.5-37 0-26 A <br /> SP-20 11/09/05 13.712 37 8 1 SCH.80 PVC 0.020 32-34 3035 27-30,35-37 0-27 ABB <br /> SP-21 11/14/05 14.235 37 8 1 SCH.80 PVC 0.020 32-34 31-34.5 2631,34.5-37 026 A <br /> SP-22 I 11/11/05 37 8 1 SCH.80 PVC 0.020 31-33 2333.5 26-29.315-37 026 A <br /> he,ron Facility#9-2033 <br /> Soil Borings(SB and OP) <br /> SBA 03/16/95 - 36.5 8 - - - - - - 0-36.5 - <br /> SB-2 08/30/00 - 85 2 - - - - - 0-85 _ <br /> SB-3(CPT-01) 08/31/00 - 94.65 - - - - - _ _ _ _ <br /> SBA(CPT-02) 08/31/00 - 94.16 - - <br /> SS-5 05/15/01 - 90.06 - - <br /> SB-6 05/16/01 - 90.06 - - <br /> SB-7 05/16/01 - 95.14 - - <br /> SB-8 05/17/01 - 90.06 - - <br /> DP-1 08/01/05 - 55 1.5 - - - - - - 055 - <br /> DP-3 07/28/05 - 61.5 1.5 - - - - - - 0-61.5 - <br /> DP-4 0727/05 - 100 1.5 - - - - - - 0100 - <br /> DP-5 0725/05 - 61.5 1.5 - - - - - - "I'S - <br /> DP-6 0726/05 - 58 1.5 - - - - - - 058 <br /> DP-7 0725/05 - 56.5 1.5 - - - - - - 056.5 - <br /> DP-8 0729/05 - 59.5 1.5 - - - - - - 059.5 - <br /> DP-9 08/01/05 - 55.5 1.5 - - - - - - 055.5 - <br /> DP-10 1 07/29/05 - 55.5 1.5 - 0-65.5 - <br /> Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 3 of 7 Stantec <br />