My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 4:53:08 PM
Creation date
3/1/2019 3:56:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Ron Rowe Project 20805-146.010 <br /> February 2, 1998 <br /> Page 2 <br /> Evaluation Procedures <br /> EMCON will shut down the soil vapor extraction treatment system (SVETS) for a period <br /> of two weeks. After that time, EMCON will notify the SJCPHS of the date and time the <br /> SVETS will be restarted to allow the SJCPHS to be present. During the initial restart of <br /> system operation, EMCON will collect influent and effluent analytical data to evaluate the <br /> response of the petroleum hydrocarbon concentrations in the extracted soil vapor, <br /> specifically, benzene. EMCON will collect samples for laboratory analysis during the first <br /> and third hours of operation to evaluate the short term response of the subsurface soil <br /> vapor to pulsing of the system Additionally, EMCON will collect samples several times <br /> during the first week to assess the longer term response of influent benzene concentrations. <br /> A copy of the evaluation schedule is attached for your information and review. <br /> After collecting and analyzing samples from the treatment system at the site, EMCON will <br /> present the results in a letter report. The data will be used to evaluate whether the system <br /> has sufficiently completed the removal of petroleum hydrocarbons from the vadose soil at <br /> the site. If the SVETS has completed this goal, the system will be removed from the site. <br /> Tentatively, the start date for the SVETS is February 9, 1998. EMCON will confirm the <br /> date with SJCPHS one week before system start-up. <br /> If you have any questions or comments regarding this letter, please call one of the <br /> undersigned. <br /> Sincerely, <br /> EMCON <br /> Matt Turner 7a . Jo on,R.G. <br /> Remediation Manager nior oject Supervisor <br /> Attachment: Evaluation Schedule <br /> cc: Kyle Christie,ARCO Products Company <br /> Joel Coffman,EMCON <br /> SAC,N�PJO'M80"8051460.1AB-96\pmsmer.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.