My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0001255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 5:57:47 PM
Creation date
3/1/2019 4:08:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001255
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r - _ <br /> y ,t 3939 Cambridge I3oad <br /> Suite 220 <br /> Cameron Park, CA 95682 9007 <br /> T'eI 530 676 6884 <br /> E Fax 5 30 676 6885 <br /> he � ' <br /> group- <br /> September 14, 1999 <br /> Project 20805-146 013 <br /> Mr Kyle Christie <br /> ARCO Products Company <br /> P O Box 5077 <br /> Buena Park, California 90622-5077 <br /> Re Quarterly Groundwater Monitoring Report, Second Quarter 1999, for Former ARCO <br /> Service Station No 2168, Located at 441 Charter Way, Stockton, California <br /> Dear Mr Christie. <br /> Pinnacle Environmental Solutions, a division of EMCON (Pinnacle), is submitting the attached <br /> report which presents the results of the second quarter 1999 groundwater monitoring and <br /> sampling program at former ARCO Products Company (ARCO) Service Station No 2168, <br /> located at 441 Charter Way, Stockton, California The quarterly monitoring program is in <br /> compliance with the San Joaquin County Public Health Services requirements regarding <br /> underground storage tank investigations The performance of the remediation system is in <br /> compliance with the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) <br /> permit requirements <br /> LIMITATIONS <br /> No monitoring event is thorough enough to describe all geologic and hydrogeologic conditions of <br /> interest at a given site if conditions have not been identified during the monitoring event, such a <br /> finding should not therefore be construed as a guarantee of the absence of such conditions at the <br /> site, but rather as the result of the scope, limitations, and cost of work performed during the <br /> monitoring event <br /> Please call if you have any questions <br /> Sincerely, <br /> Pinnacle <br /> '04&;z;0""' <br /> Mark Cap ,R G 6561 J 1 Coffman <br /> Project Manager enior Project Supervisor <br /> Attachment Quarterly Groundwater Monitoring Report, Second Quarter 1999 <br /> cc. Ron Rowe, San Joaquin County Public Health Services <br /> Mark List, California Regional Water Quality Control Board <br /> Kai Chen, San Joaquin Valley Unified Air Pollution Control District <br /> CP 1c WrchivelArco121681Otriv121690299 DOC-981st 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.