My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0001255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 5:57:47 PM
Creation date
3/1/2019 4:08:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001255
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.} rl <br /> Date September 14, 1999 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 02168 Address 441 Charter Way, Stockton, California <br /> ARCO Environmental Engineer Kyle Christie <br /> Consulting Cc/Contact Person Pinnacle/Mark Capps <br /> Consultant Protect No 20805-146 013 <br /> Primary Agency/Regulatory 1D No Ron Rowe, San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (Second 1999) <br /> 1 Prepared and submitted quarterly groundwater monitoring report for first quarter 1999 <br /> 2 Performed quarterly groundwater monitoring and sampling for second quarter 1999 Groundwater <br /> samples were collected from monitoring wells MW-1 through MW-7 and submitted for laboratory <br /> analysis <br /> WORK PROPOSED FOR NEXT QUARTER (Third 1999) <br /> 1 Prepare and submit quarterly groundwater monitoring report for second quarter 1999 <br /> 2 Pinnacle will continue to perform quarterly groundwater monitoring for ARCO The next sampling <br /> event is tentatively scheduled for August 1999 Groundwater samples will be collected and analyzed <br /> for total petroleum hydrocarbons as gasoline (fPHG) using U S Environmental Protection Agency <br /> (USEPA) Method 8015, for benzene, toluene, ethylbenzene, and total xylenes (BTEX), and methyl <br /> tert-butyl ether (MTBE) using USEPA Method 8020, and for oxygenates using USEPA Method 8260 <br /> Current Phase of Protect Monitoring <br /> Frequency of Groundwater Sampling MW-1 through MW-7= Quarter) <br /> Frequency of Groundwater Monitoring Quarter) <br /> Sample Date May 25, 1999 <br /> Is Free Product (FP) Present on Site No <br /> FP Recovered This Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 18 12 to 22 02 <br /> Direction of Groundwater Flow East-Southeast <br /> Groundwater Gradient 0 003 <br /> SVE QUARTERLY OPERATION AND PERFORMANCE <br /> CP\C 1Archrve\Arco121681Qtrly12168Q299 DOC-98b11 T <br />
The URL can be used to link to this page
Your browser does not support the video tag.