My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012562
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
440
>
2900 - Site Mitigation Program
>
PR0536618
>
ARCHIVED REPORTS XR0012562
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 10:37:51 AM
Creation date
3/4/2019 8:02:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012562
RECORD_ID
PR0536618
PE
2960
FACILITY_ID
FA0021026
FACILITY_NAME
STOCKTON CHARTER WAY COMMON PLUME
STREET_NUMBER
440
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
639
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S >7y\r'SV'''c p •`_"� r wFrh�'�... _...n, 5,. Y ...S.�'�t <br /> d } a <br /> C*.�"7 � k i S ti• i ,�^ i i f <br /> moi- w- <br /> � �•��' � <br /> -��"' <br /> < '� <br /> F or rC <br /> r , <br /> w. �t <br />;+ter <br /> i <br /> Texaco Refining and Marketing Inc, <br /> April 7, 1989 <br /> 202/150-4150 <br /> local procedures which .require that a Site Specific Safety Plan <br /> be developed and implemented, <br /> ' The purpose of this site Specific Safety plan is to provide <br /> field personnel and subcontr„ctors with an understanding of the <br /> to potential chemical and physical hazards that exist or may arise <br /> while the following tasks of this project are performed: <br /> O Investigatory Soil Boring and Sampling <br /> ~ c Monitoring Well Installation <br /> To ensure the well.-being of all fieri personnel and the <br /> w - community surrounding this facility, Project staff and approved <br /> subcontractors must adhere to the policies and procedures <br /> established herein. Accordingly, <br /> all personnel assigned to this <br /> Project must read this site safety plan and sign the Certifi- <br /> cation and Acknowledgment Statement (Appendix A) to certify that <br /> they have read, understood and agreed to abide by its provisions. <br /> PROPOSED DATES Op SITp. WORK <br /> April, 1489, <br /> COXTAMINANTS <br /> Gasoline hydrocarbons (including benzene, toluene, ethyl- <br /> benzene, and xylene) . <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.