My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001357
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
440
>
2900 - Site Mitigation Program
>
PR0536618
>
ARCHIVED REPORTS XR0001357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 11:02:49 AM
Creation date
3/4/2019 8:17:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001357
RECORD_ID
PR0536618
PE
2960
FACILITY_ID
FA0021026
FACILITY_NAME
STOCKTON CHARTER WAY COMMON PLUME
STREET_NUMBER
440
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> ranging from 4 85 to 434 ppb A chemical concentration map is presented on <br /> Figure 2 <br /> Quarterly Sampling <br /> Groundwater samples were analyzed for total purgeable hydrocarbons as gasoline (TPHg) by <br /> EPA Method 8015 (Modified) and benzene, toluene, ethylbenzene, xylenes (BTEX), and <br /> methyl tertiary butyl ether (MTBE) by EPA Method 8020 <br /> Field monitoring data and chemical analytical data are presented in a summary table in <br /> Blaine's groundwater monitoring report (Appendix A) <br /> Conclusions <br /> Groundwater samples collected from the monitoring wells this quarter contained petroleum <br /> hydrocarbon concentrations similar to previous quarters' concentrations Groundwater flow <br /> direction and gradient was found to be consistent with the previous monitoring event's <br /> findings <br /> Groundwater monitoring and sampling will continue on a quarterly basis for this site <br /> Closing <br /> Cambria submitted a work plan for further investigation to SJCPHS on August 26, 1999 We <br /> are prepared to implement the work plan once we have received written approval from <br /> SJCPHS <br /> 1399 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.