My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001384
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
440
>
2900 - Site Mitigation Program
>
PR0536618
>
ARCHIVED REPORTS XR0001384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 11:37:16 AM
Creation date
3/4/2019 9:51:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001384
RECORD_ID
PR0536618
PE
2960
FACILITY_ID
FA0021026
FACILITY_NAME
STOCKTON CHARTER WAY COMMON PLUME
STREET_NUMBER
440
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> feasible at the site The radius of influence was approximately 25 feet at a flow rate of <br /> approximately 20 cubic feet per minute The vapor concentrations of total petroleum <br /> hydrocarbons as gasoline(TPHg) ranged from 3,300 to 30,000 milligrams per cubic meter <br /> (mg/m3) <br /> 2.0 SCOPE OF WORK <br /> A Site Specific Health and Safety Plan prepared in accordance with Occupational Safety and <br /> Health Adnumstration (OSHA) Standard 29 CFR 1910 120 was completed by SECOR for this <br /> site All personnel contracted for the field investigation were required to review and understand <br /> this plan In addition, Underground Services Alert was notified to safeguard that the trenching <br /> activities would not impact any subsurface utilities <br /> 21 Permitting <br /> In November 1993, an Interim Soil Remediation Work Plan prepared for the site was approved by <br /> the San Joaquin County Public Health Services, Environmental Health Division (PHS/EHD) <br /> After completing the required public notification process, an Authority to Construct Permit (No <br /> N-3139-1-0)was obtained from the San Joaquin Valley Unified Air Pollution Control District <br /> (SJAPCD) Prior to commencing work, a building permit was issued by the City of Stockton <br /> 22 Trenching and Underground Piping Installation <br /> Trenching and the installation of underground piping began at the site on September 19, 1994 <br /> To reduce the amount of concrete cutting at the site, subsurface piping was installed in the <br /> planters wherever possible Two separate trenches were required to complete the installation of <br /> the soil remediation system The first trench was positioned in the planter along the southern <br /> boundary of the site to supply gas and electric service to the treatment compound The second <br /> trench was located primarily in the planter along the eastern boundary of the site to convey 2-inch <br /> diameter Schedule 40 polyvinyl chloride (PVC) vapor extraction piping from each of the vapor <br />. kb NO torr 2 Scptanber�i"6 <br /> lab No NOOOI.006.01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.