My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS QUARTERLY STATUS REPORT 2016 1ST QUARTER
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
ARCHIVED REPORTS QUARTERLY STATUS REPORT 2016 1ST QUARTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 1:36:42 PM
Creation date
3/4/2019 11:25:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
QUARTERLY STATUS REPORT 2016 1ST QUARTER
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 29,2016 <br /> Ms. Cori Condon <br /> Reference: Quarterly Status Summary Report-First Quarter 2016 <br /> 3. Stantec will obtain quotes from subcontractors to perform well installations and site <br /> expansion according to the Work Plan submitted to the CVRWQCB, dated February 29, <br /> 2016. <br /> 4. Stantec will prepare and submit the QSSR 1Q16. <br /> Limitations <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the Site. It was <br /> prepared for the exclusive use of ARC, CEMC, Shell, and BBU for the express purpose stated <br /> above. Any re-use of this report for a different purpose or by others not identified above shall be <br /> at the user's sole risk without liability to Stantec. To the extent that this report is based on <br /> information provided to Stantec by third parties, Stantec may have made efforts to verify this <br /> third party information, but Stantec cannot guarantee the completeness or accuracy of this <br /> information. The opinions expressed and data collected are based on the conditions of the Site <br /> existing at the time of the field investigation. No other warranties, expressed or implied, are <br /> made by Stantec. <br /> Prepared by: Reviewed by: <br /> Richie Winn Brian Egger <br /> Geologic Staff Associate Scientist <br /> Information, conclusions, and recommendations provided by Stantec in this document <br /> regarding the site have been prepared under the supervision of and reviewed by the licensed <br /> professional whose signature appears below. <br /> Licensed Approver: � ,VAAL G 0 <br /> F <br /> 1- <br /> O <br /> W BRIAN D. Vu <br /> a' <br /> '�- <br /> WEST OFF <br /> Brian Westhoff, P.G. No.8784 <br /> Senior Geologist <br /> April 29, 2016 9TFOF CAoF <br />
The URL can be used to link to this page
Your browser does not support the video tag.