Laserfiche WebLink
April 29,2016 <br /> Ms. Cori Condon <br /> Reference: Quarterly Status Summary Report-First Quarter 2016 <br /> 3. Stantec will obtain quotes from subcontractors to perform well installations and site <br /> expansion according to the Work Plan submitted to the CVRWQCB, dated February 29, <br /> 2016. <br /> 4. Stantec will prepare and submit the QSSR 1Q16. <br /> Limitations <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the Site. It was <br /> prepared for the exclusive use of ARC, CEMC, Shell, and BBU for the express purpose stated <br /> above. Any re-use of this report for a different purpose or by others not identified above shall be <br /> at the user's sole risk without liability to Stantec. To the extent that this report is based on <br /> information provided to Stantec by third parties, Stantec may have made efforts to verify this <br /> third party information, but Stantec cannot guarantee the completeness or accuracy of this <br /> information. The opinions expressed and data collected are based on the conditions of the Site <br /> existing at the time of the field investigation. No other warranties, expressed or implied, are <br /> made by Stantec. <br /> Prepared by: Reviewed by: <br /> Richie Winn Brian Egger <br /> Geologic Staff Associate Scientist <br /> Information, conclusions, and recommendations provided by Stantec in this document <br /> regarding the site have been prepared under the supervision of and reviewed by the licensed <br /> professional whose signature appears below. <br /> Licensed Approver: � ,VAAL G 0 <br /> F <br /> 1- <br /> O <br /> W BRIAN D. Vu <br /> a' <br /> '�- <br /> WEST OFF <br /> Brian Westhoff, P.G. No.8784 <br /> Senior Geologist <br /> April 29, 2016 9TFOF CAoF <br />