P <br /> S E C 0 R <br /> 5 <br /> . Conceptual Site Model <br /> March 24, 2004 <br /> Page 17 <br /> V <br /> (B4-29-S) to 4,800 mg/kg (B-4114-S) Benzene was detected in groundwater at concentrations of <br /> 0 057 pg/L in 64-67-W and 1 8 pg/L in 135-85-W These activities are summarized in Stratus's <br /> October 27, 2000 Additional Soil and Groundwater Investigation Report <br /> Excerpts from the Dolly Madison Bakery reports are presented in Appendix M <br /> X <br /> 6 7 Shell Branded Service Station <br /> 6 7 1 Site Description <br /> The site is currently an operating Shell branded service station located on the southeast corner of <br /> West Charter Way and Interstate 5 The site consists of a service station building, six dispenser Y <br /> islands, USTs, and a car wash In November of 1989, four USTs were excavated and removed <br /> Based on a review of available documents during a file review conducted by SECOR, the date Shell <br /> initiate retail gasoline operations could not be determined and current USTs design criteria could not <br /> be ascertained These activities are summarized in Cambria's July 20, 2000 Site Investigation <br /> Report <br /> n <br /> 672 Remedial Activities <br /> In April of 1990 a free product skimming system was installed in monitong well MW-2, reports <br /> ri <br /> iindicate approximately 180 gallons of free product was removed A SVE system operated at the site ; <br /> from September 1993 to November 1996 Between December 1989 and January 1990 five SVE <br /> wells (MW-2 through MW-5, and MW-7) were installed along the eastern property boundary, in the <br /> vicinity of the former dispenser islands product piping and former USTs SVE wells were screened <br /> from approximately 20 feet bgs to 40 feet bgs The SVE system removed approximately 14,980 r <br /> pounds of petroleum hydrocarbons in the first year of operation Based on a review of available t <br /> documents during a file review conducted by SECOR, the rationale for shutting down the SVE <br /> system could not be determined <br /> 67.3 Historical Report Summary <br /> In January of 1993, Aegis Environmental, Inc converted the SVE system from thermal oxidizer mode <br /> to catalytic oxidizer mode The conversion reduced the hydrocarbon emissions from the SVE <br /> system by greater than 95% A thermal oxidizer had been operating at the site since September 17, <br /> 1992 (Cambria, 2000) These activities are summarized in Aegis's February 1, 1993 Catalyst <br /> Installation/Systems Status Soil Vapor Extraction and emission Control System <br /> In March of 2000, Cambria advanced four CPT borings (CPT-1 through CPT-4) to define the extent <br /> of hydrocarbon impact to soil and groundwater at the site Groundwater was first encountered from <br /> 16 5 feet bgs to 17 5 feet bgs Silt was encountered from approximately 70 feet bgs to 77 feet bgs, <br /> sand and silty sand was encountered to approximately 85 feet bgs Groundwater flows <br /> predominantly to the northeast and east Stratigraphy encountered consisted predominantly of at <br /> TPHg was detected in soil at concentrations ranging from 1 28 mg/kg (CPT-1 at 40 5 feet bgs) to 356 <br /> mg/kg (CPT-4 at 73 feet bgs) Benzene was detected in soil at concentrations ranging from 0 00564 <br /> Smg/kg (CPT-4 at 79 5 feet bgs) to 0 219 mg/kg (CPT-1 at 40 5 feet bgs) MtBE was not detected in f <br /> soil above laboratory reporting limits in any of the samples submitted for chemical analysis TPHg <br /> 11Chevron1920331REPORTSICSMICSM 92033(REV B)doc <br /> Y <br /> �w.n <br />