My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001245
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
ARCHIVED REPORTS XR0001245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 2:18:44 PM
Creation date
3/4/2019 1:13:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001245
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• direction of Eric Trevena. An excavator bucket was used to <br /> collect a sample from each location. The samples were <br /> collected by removing the top 3" to 6" of soil in the <br /> bucket, then pushing a brass tube into the soil until <br /> completely filled. Soil samples were collected in clean -six- <br /> inch-long brass tubes ( 2 " in diameter) . Tubes were covered <br /> at both ends with aluminum foil and sealed with plastic end <br /> caps,. The soil samples were then labeled, recorded on a <br /> Chain-of=Custody- form, put in a cooler with ice and <br /> transported to Sequoia Analytical, Inc . located in Redwood <br /> City and Walnut Creek, California. <br /> UST Excavation Sampling <br /> Soil samples designated T1 through- T6 were collected from <br /> beneath the fuel USTs in the excavation bottom in native <br /> soil near each end of the tanks . Soil samples were collected <br /> at approximately 15 feet below grade surface (bgs ) . <br /> Soil samples designated UO and UOB, were collected beneath <br /> the used oil tank at approximately 12 feet bgs . Some of the <br /> chemical analyses for sample UO were inadvertently not <br /> included on the original Chain--of-Custody, therefore sample <br /> UOB was collected in the same approximate location as UO on <br /> March 4, 1997 to analyze for additional chemical compounds . <br /> The used oil tank remote fill piping was sampled (RF-1 . 5 and <br /> 01 RF2--2 . 5) at each end on September 11, 1996 under the <br /> direction of Harlin Knoll., a inspector also with SJCPHS . <br /> The approximate sample locations are shown on Figure 2 . <br /> Sample depths and chemical summaries are found in Tables A <br /> and B. <br /> Trench Sampling' <br /> Trenches were excavated to expose and remove underground <br /> product piping and vent lines extending from the fuel UST <br /> complex to the service islands on September 9 , 1996 . Soil <br /> samples P1 through P7 were collected after piping was <br /> removed at depths approximately 1 1/2 to 4 . 5 feet below <br /> grade (Figure 2 ) . Samples were collected from the trench <br /> bottom and then handled as described previously. Sample <br /> depths and chemical analytical results are summarized in <br /> Table A. These samples were collected from locations <br /> designated by Eric Trevena in accordance with the RWQCB and <br /> County Guidelines . <br /> Hoist and Sump Sampling <br /> 4 ` <br /> One dual post hoist and two semi--hydraulic hoists were <br /> 0 removed and discrete soil samples were collected on <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.