My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001245
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
ARCHIVED REPORTS XR0001245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 2:18:44 PM
Creation date
3/4/2019 1:13:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001245
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. September 9 , 1996 from beneath each hoist post after removal <br /> at approximately 8 feet bgs . Soil samples were designated H1 <br /> through H4 . One sample (HT) was collected beneath the dual <br /> foist hydraulic tank (approximately 35 gallons ) - at 6 feet <br /> bgs and one sample (SUMP) was collected beneath the <br /> oil/water separator at approximately 5 feet bgs . Sample <br /> locations are shown in Figure 2 and chemical summaries are <br /> found in Tables A and B. - <br /> OVEREXCAVATION ACTIVITIES <br /> Soil remediation involved the limited excavation and removal <br /> of suspected or confirmed hydrocarbon impacted soils . Soils <br /> were overexcavated from the fuel UST complex, center (dual <br /> post) hoist area, and former pump islands . Overexcavation <br /> and associated sampling activi.tes were performed on <br /> September 11, 1996 and October 9 , 1996. Overexcavation and <br /> sampling activities were performed under the direction and <br /> observation of Harlin Knoll, inspector and representative <br /> with San Joaquin County Public Health Services . <br /> Hoist Overexcavation <br /> On September 11, 1996 additional soil was excavated around <br /> the vicinity of the dual post hydraulic hoist where the <br /> • initial sample H4 was collected. The soil around the former <br /> hoist was removed and the final excavation measured <br /> approximately 4 feet in width, 5 feet long and 8 1/5 feet in <br /> depth. Soil sample HX-8 . 5 was collected in the bottom of the <br /> excavation beneath former sample H4 . See Figure 3 for sample <br /> location and Table A for analytical summary. <br /> Fuel UST Overexcavation <br /> The original fuel UST excavation was extended vertically to <br /> approximately 17 to 18 feet -bgs on September 11, 1996 . <br /> Additional excavation bottom samples were collected and <br /> designated TXB1, TXB2 and TXB3 . Excavation sidewall samples <br /> designated TXS1 through TXS6 were also collected at depths <br /> between 14 to 16 feet bgs as shown in Figure 3 . Sample <br /> depths are found with chemical summaries in Table C. <br /> After receiving chemical analytical data from September 11, <br /> 1996 sampling, additional excavation was performed on <br /> October 9, 1996 . Overexcavation continued along the southern <br /> sidewall approximately 5 feet and vertically to 19 feet bgs <br /> in the vicinity of former samples TXB1 and TXS3 . A soil <br /> sample designated OXB1 was collected from the excavation <br /> bottom beneath former sample TXB1 at approximately 19 feet <br /> bgs . And sidewall sample OXS1 ,was collected at approximately <br /> 16 . 5 feet bgs in the vicinity of former sample TXS3 . The <br /> final fuel UST excavation dimensions were approximately 37 <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.