My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001174
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
ARCHIVED REPORTS XR0001174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 3:22:38 PM
Creation date
3/4/2019 1:39:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001174
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• An approximately 2 foot thick zone of bentonite will be placed above the sand filter <br /> pack <br /> 1 . The annulus above the bentonite will be grouted with a cement slurry placed by <br /> tremmae of significant water is present in the boring The cement grout should <br /> extend to a depth of approximately 1 foot below the ground surface <br /> • A traffic-rated housing will be placed above the well casing and set in concrete <br /> The well housing should be set approximately one-inch above the ground surface <br /> The well number will be recorded on the well monument A locking device will be <br /> installed to minimize the likelihood of unauthorized access to the well <br /> • The grout will be allowed to cure for approximately 48 to 72 hours prior to <br /> monitoring well development <br /> • A well reference measuring point will be placed on the north side of the monitoring <br /> well casing The location and elevation of the top of casing at the reference point <br /> of the newly installed well and existing well will be surveyed relative to mean sea <br /> level by a licensed surveyor to second order accuracy <br /> O The water level and depth to the bottom of the well will be measured to the nearest <br /> 0 01-foot using an electronic water level indicator The presence of free-phase <br /> petroleum product will be assessed <br /> Well Development Procedures <br /> o Well development will be conducted by initially surging the well with a surge <br /> block, followed by removal of water with a pump and/or bailer Surging will be <br /> conducted over 5-foot intervals of the screened well casing, beginning at the <br /> bottom of the well Surging should be conducted at least twice over the entire <br /> length of the well screen Well development activities will be recorded on well <br /> development forms <br /> 0 A minimum of five well casing volumes of water will be removed from the well <br /> during development The temperature, conductivity, and pH of the groundwater <br /> removed during development of the well will be monitored Development should <br /> continue until the measured groundwater parameters have stabilized and the <br /> turbidity of the water removed has decreased to a degree as judged acceptable <br /> o Water removed from the well will be contained an a portable polyethylene tank <br /> The tank will be transported and stored at the IT office pending laboratory analysis <br /> and disposal of the groundwater <br /> ITCORPORATION <br /> SAC 111SACRFPIICOMMONIsacl)P120021P"P]818801880039IA 2ab doc <br /> (01020000) <br /> A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.