My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001174
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
ARCHIVED REPORTS XR0001174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 3:22:38 PM
Creation date
3/4/2019 1:39:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001174
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br /> I <br /> e1 <br /> Ms Lori Duncan Project 880-039 IA <br /> March 13, 2002 <br /> Page 2 <br /> Thorpe Oil of Lodi, California, removed the second UST in February 1996 Residual <br /> hydrocarbons were detected in soil samples collected from beneath the UST <br /> Between September 17 and October 11, 1996, EMCON/OWT observed the drilling of six <br /> soil borings (B-1R through B-6R) One soil boring was converted to monitoring well <br /> MW-1R, three soil borings were converted to dual completion vapor extraction wells <br /> VW-1 through VW-3, and one soil boring was converted to a single vapor extraction well <br /> VW-4 <br /> On February 3, 2000 a soil vapor extraction (SVE) system was brought on line The <br /> system consists of four shallow zone and three deep zone SVE wells, from which soil <br /> vapors are extracted using a Stealth Bobcat Catalytic Oxidizer rated at 100 cubic feet per <br /> minute (cfm) <br /> SCOPE OF WORK <br /> IT proposes to install two groundwater monitoring wells and one deep soil boring <br /> Drilling and sampling procedures are included in Attachment A <br /> Health and Safety Plan <br /> Prior to the initiation of field work, a site Health and Safety Plan will be prepared in <br /> accordance with 29 CFR 1910 120 The health and safety plan will include safety <br /> rprocedures for work to be performed at the site, chemical hazard information, site safety <br /> officers, and preferred medical emergency locations A draft Health and Safety Plan has <br /> been included in Attachment B <br /> IT CORPORATION <br /> SACIIISACRFPIICOMMON1sacDP120021PRJ\PJ818801880039IA tab doc <br /> (01020000) <br />
The URL can be used to link to this page
Your browser does not support the video tag.