My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001174
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
ARCHIVED REPORTS XR0001174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 3:22:38 PM
Creation date
3/4/2019 1:39:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001174
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr Ron Rowe Proposal 22613-100 002 <br />• January 30, 1998 <br /> Page 3 <br /> SCOPE OF WORK <br /> EMCON has prepared the following scope of work to complete the requirements <br /> associated with the project objectives All work will be performed following Appendix A of <br /> the Regional Water Quality Control Board's Tri-Regional Guidelines <br /> Task 1 - System Design and Preparation of Construction Specifications <br /> Preparation of design and construction plans and details will include, but is not hrruted to, <br /> specifications for the following <br /> e Remediation compound, including fencing and utility conduits <br /> s Installation of thermal or catalytic oxidizer, propane tank, and process piping and <br /> instrumentation. During an initial evaluation, EMCON will determine if lead is <br /> present in the soil vapors and EMCON will use either a thermal or catalytic <br /> oxidizer, whichever is appropriate <br />• o Installation of vapor extraction wellheads and subgrade piping <br /> o Installation of electrical services to the compound (if required) <br /> o Trenching, subgrade pipe installation, backfill, compaction, and resurfacing, where <br /> necessary <br /> Task 2 - Permitting <br /> EMCON will secure the following permits <br /> o An Authority-to-Construct (ATO)/Perrrut-to-Operate (PTO) from the San <br /> Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) Due to the <br /> proximity of the subject site (less than 1,000 feet) to a lugh school, the <br /> SJVUAPCD requires a public notification process to issue the ATO and PTO an <br /> abatement device <br /> o Building, planning, and fire department permits from the City of Stockton, if <br /> required <br /> o, Submittal of an electrical service application to Pacific Gas and Electric (PG&E) <br /> SACNN"PJ2\2613\26131000 2AB-9814baccus 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.