My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001174
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
ARCHIVED REPORTS XR0001174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 3:22:38 PM
Creation date
3/4/2019 1:39:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001174
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr Ron Rowe Proposal 22613-100 002 <br />• January 30, 1998 <br /> Page 5 <br /> USEPA Method 8020 The vapor samples will be submitted on a 24-hour <br /> turnaround basis <br /> • EMCON will prepare and submit a source test report to the SJVUAPCD and <br /> apply for a PTO <br /> Task 5 - Operation and Maintenance of the Remediation System- <br /> EMCON will perform O&M of the SVE system for 6 months Tasks will include the <br /> following <br /> e An EMCON technician will make weekly site visits during the first month of <br /> operation to check for stable operation of the SVE system and collect operational <br /> data After the first month, site visits will be performed on a biweekly (twice a <br /> month) basis for maintenance and data collection purposes Data collection will <br /> include measurement of flow rate and applied vacuum at each vapor extraction <br /> well and influent to the abatement device, measurement of induced vacuum at <br />. selected observation wells, and field monitoring of organic vapor and percent <br /> oxygen in extraction wells and the abatement device <br /> o An EMCON technician will collect air samples weekly for the first month and <br /> quarterly thereafter from the influent and effluent to the abatement device for <br /> laboratory analysis. Vapor samples will be collected from individual wells twice <br /> during the 6-month extraction period Vapor samples will be analyzed for TPHG, <br /> BTEX, and MTBE <br /> o EMCON will prepare quarterly reports presenting laboratory analysis results, field <br /> results of influent and effluent samples, destruction efficiency of the abatement <br /> device, radius of influence of the SVE system, evaluation of the decline of <br /> hydrocarbon concentrations from each vapor extraction well with time, and <br /> cumulative pounds and/or gallons of hydrocarbons removed. The original report <br /> will be forwarded to property owner, Mr Rodgers, and copies of the report will <br /> be distributed to the appropriate regulatory agencies <br /> SAON VJ2\2613\26131000 2AB-98Vbaccus 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.