My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001175
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
ARCHIVED REPORTS XR0001175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 7:40:19 PM
Creation date
3/4/2019 1:39:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001175
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' Mr John Benedict Project 880039 IA <br /> January 26, 2001 <br /> Page 4 <br /> satisfactorily The catalyst was serviced during the first week of January 2001, to improve <br /> system destruction performance Completed O&M field sheets are presented in Appendix D <br /> System Performance Status <br /> During the fourth quarter 2000, the system emissions were in compliance with air board <br /> discharge requirements Destruction efficiencies ranged from 65 to 90 percent To improve <br />' destruction efficiency, the catalyst was serviced (baked) during the first week of January 2001, <br /> and is scheduled to be replaced in the first quarter 2001 System performance data is <br /> summarized below and in Tables 1 through 3, located in Appendix D Removal rate, destruction <br /> efficiency, and emission rate calculations are presented in Appendix D <br /> Fourth Quarter 2000 System Performance Summary <br /> Total pounds TPH-g removed since startup 2,486 <br /> Total pounds TPH-g removed during this reporting period 333 <br /> Total pounds benzene removed since startup 26 <br /> Total pounds benzene removed during this reporting period 1 <br /> Average flow rate for this reporting period(acfm) 53 <br /> System uptime during this reporting period(%) 57 <br />' Current TPH-g daily removal rate(pounds per day) 9 <br /> TPH-g and benzene destruction efficiency(%) 65 to 90 <br />' TPH-g errussion rate to atmosphere(pounds per day) 0 38 to 1 11 <br /> Benzene ermssion rate to atmosphere(pounds per day) <0 0002 to 0 0011 <br /> CONCLUSIONS <br />' Analytical results of collected groundwater samples were generally consistent with previous <br /> sampling events Groundwater elevation decreased 0 92 foot from the previous sampling event <br /> (August 2000) <br /> Approximately 333 pounds of TPH-g and one pound of benzene were removed during the fourth <br /> quarter Destruction efficiencies ranged from 65 to 90 percent TPH-g mass emissions to the <br /> atmosphere ranged from 0 38 to 1 11 pounds per day, and benzene mass emissions ranged from less <br /> than 0 0002 to 0 0011 pounds per day, demonstrating the system is operating consistent with permit <br /> requirements <br /> IT CORPORATION <br /> SAC 11+11sacDp\2001�PRJ1PJ81880039 la iaa doc-001ta 1 <br /> (01010000) <br />
The URL can be used to link to this page
Your browser does not support the video tag.