Laserfiche WebLink
y <br />' Mr John Benedict Project 880039 lA <br /> January 26, 2001 <br /> Page 5 <br /> IT will continue to perform quarterly groundwater sampling The next sampling event is <br /> tentatively scheduled for February 2001. IT will continue soil vapor extraction system O&M <br /> O&M site visits will occur weekly and compliance sampling will continue to occur monthly <br /> Please call if you have questions regarding this report or any aspect of the project <br /> Sincerely, <br />' IT CORPO TION <br /> S 7oFmAI <br /> Mark Capps, R G 6561 Project Geologist Engineer <br />' Attachments Table 1 Groundwater Monitoring Data <br /> Figure 1 Site Location Map <br /> Figure 2 Generalized Site Plan <br /> Appendix A Groundwater Monitoring Field Data Sheets <br /> Appendix B Groundwater Sampling and Analysis Procedures <br /> 1 Appendix C Groundwater Chain-of-Custody Records and Laboratory <br /> Analysis Reports <br /> Appendix D Treatment System O&M Field Sheets, Laboratory Analytical <br />' Reports, Chain of Custody Documentation, System O&M Tables, <br /> and System Calculations <br /> ' cc Linda Duncan, San Joaquin County Public Health Services <br /> Mark List, California Regional Water Quality Control Board <br /> Don Rodgers, The Transmission Shop <br /> ' Linda Sanborn, California UST Cleanup Fund Program <br /> IT CORPORATION <br /> 1N\sacDP\20011PR]1PI61860034 1A.1aa doc-001tt 1 <br /> (01010000) <br />