Laserfiche WebLink
r <br /> rMr John Benedtct Project No 880-039 1A <br /> iOctober 18, 2002 <br /> Page 3 <br />' attempted to coordinate joint quarterly sampling with the former ARCO Facility 2168, <br /> located east and downgradient of the subject site, but has not gotten a response from their <br /> consultant Free product was not observed in groundwater monitoring wells (see Table 1 <br /> and Appendix A) Shaw E &I used the third quarter 2002 data to evaluate changes in <br /> concentrations of dissolved petroleum hydrocarbons in the groundwater Shaw E &I <br /> sampling and analysis procedures are presented in Appendix B <br /> The groundwater samples were analyzed at Sparger Technology in Sacramento, <br /> California, for TPH-g using U S Environmental Protection Agency (USEPA) <br /> LMethod 8015M, and for BTEX and MTBE using USEPA Method 8020M Copies of the <br /> chain-of-custody records and laboratory analytical report are presented in Appendix C <br /> The results of laboratory analyses indicated that dissolved hydrocarbons were present in all <br /> three wells sampled TPH-g were reported at concentrations ranging from 300 (well <br /> MW-1R) to 92,000 (well VW-2) micrograms per liter (pg/L) Benzene was reported in <br /> wells VW-2 and VW-3 at concentrations of 5,900 and 1,500 µg/L, respectively MTBE <br /> was not detected in groundwater samples collected during the third quarter 2002 sampling <br /> event Results of laboratory analyses are summarized in Table 1 <br />'r The gradient was approximately 0 02 with groundwater flow to the northwest (Figure 3), <br /> which is similar to previous events Groundwater analytical data are summarized on <br /> rFigure 4 <br /> REMEDIATION SYSTEM STATUS; THIRD QUARTER 2002 <br /> The remediation system consists of four shallow zone and three deep zone soil vapor <br /> extraction (SVE) wells, from which soil vapors are extracted using a Stealth Bobcat <br /> Catalytic Oxidizer rated at 100 cubic feet per minute (cfm) Startup of the remediation <br />' system occurred on February 3, 2000, under the supervision of regulatory personnel <br /> Subsequently, Shaw E & I staff perform weekly system O&M, collect influent and <br /> effluent air samples monthly in accordance with air board permit requirements, and <br /> report quarterly to the air board <br /> N\SacDP120021PRAPJ8188018800391A 2ag doe Shaw Environmental and Infrastructure, Inc. <br /> (01050000) <br />