My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001190
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
ARCHIVED REPORTS XR0001190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 7:44:00 PM
Creation date
3/4/2019 1:49:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001190
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr John Benedict Project No 880-039 1A <br /> . October 18, 2002 <br /> Page 4 <br />' Sampling Results <br /> On July 1, August 5, and September 5, 2002, vapor samples were collected from <br /> treatments stem influent Treatment reatrnent system effluent samples were also collected on <br /> those dates Samples were submitted to a state-certified laboratory for analysis of <br /> TPH-g and BTEX using USEPA Methods 8015 and 8020 TPH-g and benzene were <br /> only reported in the influent sample collected in the August 5, 2002, event at <br /> concentrations of 2,900 and 0.89 milligrams per cubic meter(mg/m3), respectively. <br /> TPH-g or benzene were not detected in the effluent samples Laboratory analytical <br /> reports and chain-of-custody documentation are presented in Appendix D <br /> System Performance Status <br /> The treatment system was pulsed during the third quarter 2002 In the 112 days between <br /> June 11, 2002 and September 30, 2002, the treatment system rani approximately 82 days <br /> (73 percent operational), removing 132 pounds of TPH-g System TPH-g emissions <br /> were maintained below 0 08 pounds per day, which is well below the allowable TPH-g <br /> emission rate of 6 1 pounds per day TPH-g destruction efficiency was maintained <br /> above 99 percent, and benzene destruction efficiency was maintained at 100 percent <br /> The burn chamber temperature ranged from 737°F to 757°F, well above the minimum <br />' required burn temperature of 600°F System performance data, field data sheets, and <br /> calculations are presented in Appendix D <br /> First Quarter 2002 System Performance Summary <br /> Pounds TPN-g removed since startup 3,063 <br /> Pounds TPH-g removed during this reporting period 132 <br /> TPH-g daily removal rate during reporting period(pounds per day) 161 <br />' TPH-g destruction efficiency(%) 98 3 to 100 <br /> TPH-g emission rate to atmosphere(pounds per day) <0 08 <br />' Pounds benzene removed since startup 45 <br /> Pounds benzene removed during this reporting period 02 <br /> N\sacDP120021PRI1P38188M800391A 2ag doc Shaw Environmental and Infrastructure, Inc <br /> (01050000) <br />
The URL can be used to link to this page
Your browser does not support the video tag.