My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001190
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
ARCHIVED REPORTS XR0001190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 7:44:00 PM
Creation date
3/4/2019 1:49:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001190
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr John Benedict Project No 880-039 lA <br /> . October 18,2002 <br /> Page 5 <br /> Benzene Destruction Efficiency(%) 100 <br /> Benzene emission rate to atmosphere(pounds per day) <0 0008 <br /> Average flow rate for this reporting period(scfm) 38 <br /> System uptime during this reporting period(days/%) 82 days/73% <br />' CONCLUSIONS <br /> Analytical results of groundwater samples collected from the site were generally consistent <br /> with previous sampling events Groundwater elevation decreased between 1 16 to 148 feet <br /> from the previous sampling event (May 31, 2002) The observed groundwater gradient <br /> during the third quarter 2002 was 0 02 with flow to the northwest Petroleum hydrocarbon <br /> concentrations have generally increased since the first quarter 2002 Graphs showing <br /> TPH-g, benzene, MTBE concentrations, and groundwater elevations versus time in <br /> on-site wells are presented in Appendix E <br /> Approximately 132 pounds of TPH-g and 0 2 pounds of benzene were removed during the <br /> ' third quarter 2002 The system performed in compliance with permit requirements Pulsed <br /> operation of the soil vapor extraction system began in the second quarter 2002 and will <br /> continue through the fourth quarter 2002 <br /> Shaw E & I will continue to perform quarterly groundwater sampling The next <br /> Isampling event is tentatively scheduled for November 2002 <br /> Please call David Herzog at (916) 565-4377, if you have questions regarding this report <br />' or any aspect of the project <br /> Sincerely, <br /> SHAW ENVIRONMENTAL & 0. URE, INC <br /> ��ur <br /> Q` p <br /> v � <br /> I David W Herzog, R N0.7211 <br /> Project Geologist �* <br /> N1sacDP120021PRJ\PJ81880\8800391A 2ag doc Shaw Environmental and Infrastructure,Inc <br /> (01050000) <br />
The URL can be used to link to this page
Your browser does not support the video tag.