My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001194
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
ARCHIVED REPORTS XR0001194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 7:06:23 PM
Creation date
3/4/2019 1:52:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001194
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr John Benedict Project 880-039 1A <br />' October 22, 2001 <br /> Page 4 <br /> Operational Status <br /> The treatment system operational uptime was 100 percent during the third quarter 2001 The <br /> treatment system was shut down on July 24, 2001 pending contract negotiations Treatment <br /> system field data sheets are presented in Appendix D <br /> System Performance Status <br /> During the third quarter 2001, the system TPH-g emissions were maintained below 0 01 pounds <br /> per day, well below the allowable 6 1 pounds per day as specified by the permit to operate <br /> TPH-g destruction efficiency was 95 0 percent The benzene destruction efficiency was <br /> maintained at 100 percent The burn chamber temperature was ranged from 650°F to 850°F, <br /> well above the minimum burn temperature of 600°F as specified by the permit to operate <br /> System performance data is summarized below and in Tables D1 through D3, (Appendix D) <br /> Calculations for system removal rate, destruction efficiency, and emissions are presented in <br /> Appendix D <br /> Third Quarter 2001 System Performance Summary <br /> Pounds TPH-g removed since startup 2,396 <br /> Pounds TPH-g removed during this reporting period 9 <br /> TPH-g daily removal rate during reporting period(pounds per day) 007 <br /> TPH-g destruction efficiency(%) 950 <br /> TPH-g emission rate to atmosphere(pounds per day) <0 01 <br /> Pounds benzene removed since startup 26 <br /> Pounds benzene removed during this reporting period 00 <br /> Benzene Destruction Efficiency(%) 100 <br /> Benzene emission rate to atmosphere(pounds per day) <0 00003 <br /> Average flow rate for this reporting period(acfm) 40 <br /> System operational uptime during this reporting period(%) 100 <br /> CONCLUSIONS <br />' Analytical results of collected groundwater samples from MW-1 R were generally consistent with <br /> previous sampling events Groundwater elevation decreased 143 feet from the previous <br /> sampling event (May 2001) The observed groundwater gradient was 0 002 ft/ft to the sout Cas <br /> • <br /> IT CORPORATION <br /> SAC W\sacflPV20011PRAP1818800391A lab da 00'ut 1 <br /> (01010000) <br />
The URL can be used to link to this page
Your browser does not support the video tag.