Laserfiche WebLink
I I <br /> ft <br />' Mr John Benedict Project 880-039 lA <br /> October 22, 2001 <br /> . Page 5 <br /> Approximately nine pounds of TPH-g and zero pounds of benzene were removed during the <br /> operating period in the third quarter Destruction efficiency was 95 0 percent TPH-g mass <br /> emissions to the atmosphere ranged from less than 0 01 pounds per day, and benzene mass <br /> emissions was less than 0 00003 pounds per day, demonstrating the system is operating <br />' consistent with permit requirements <br /> IT will continue to perform quarterly groundwater sampling The next sampling event is <br /> Ntentatively scheduled for November 2001 <br /> Please call if you have questions re arding this report or any aspect of the project <br /> �,D Gp0l <br /> Sincerely, O <br /> MICHAEL. <br /> 1 IT CORPORATION S <br /> SGOURAM <br /> No 7184 Q <br /> Mike S ourakis RG 7194 O <br /> g f CKathleen A Waldo <br /> . Project Geologist - aAWk Staff Engineer <br /> Attachments Table 1 Groundwater Monitoring Data <br /> Figure 1 Site Location Map <br /> Figure 2 Generalized Site Plan <br /> 1 Appendix A Groundwater Monitoring Field Data Sheets <br /> Appendix B Groundwater Sampling and Analysis Procedures <br /> Appendix C Groundwater Chain-of-Custody Records and Laboratory <br /> Analysis Reports <br /> Appendix D Treatment System O&M Field Sheets, Laboratory Analytical <br /> Reports, Cham-of-Custody Documentation, System O&M Tables, <br /> and Emission Calculations <br /> cc Lori Duncan, San Joaquin County Public Health Services <br />' Mark List, California Regional Water Quality Control Board <br /> Don Rodgers, The Transmission Shop <br /> Linda Sanborn, California UST Cleanup Fund Program <br />' <br /> SAC 1155ACRFPIICOMMON1sacD%2001\PRAP7818800391A.[abdoa00Ait] IT CORPORATION <br /> (01010000) <br />