My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012563
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
3500 - Local Oversight Program
>
PR0544216
>
ARCHIVED REPORTS XR0012563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 1:33:30 AM
Creation date
3/4/2019 2:42:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012563
RECORD_ID
PR0544216
PE
3528
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
Stockton
Zip
95206
APN
16504007
CURRENT_STATUS
02
SITE_LOCATION
620 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
982
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.,s'���,�,5�. �� .�_''�yw" �p `�"S,,�b� �� �r..w»ate`'.". � n� � s�� ,t ..? ti.' �.V y � �y � � ���a•+ <br />� ., r4 x. r .� M� ..�, `T Y7i ,i,.�'—o A WY :us rn.:C 'd h ' �' •'R" <br /> ix <br /> Vii• <br />�s <br /> r <br /> Ms.Laurie A Cotulla <br /> December 5, I990 <br /> Page 2 <br /> The titles and formats of the reports submitted to date do not reflect routine Quarterly Monitoring <br /> Report submittals;however,the appropriate monitoring and status information was submitted for the <br /> monitoring events conducted through September 1990 in the content o1 the Supplemental Data Re <br /> submitted October 8, 1990, port <br /> Continued free product recovery and quarterly monitoring arc being conducted by Delta at the <br /> referenced site, In the future,beginning with First Quarter 1991 data,Quarterly Monitoring Reports <br /> will be submitted in the format referenced in your November 26, 1990.leiter. <br /> A Final Remedial Plan is currently being finalized by Wta. However, it will not be possible to <br /> accomplish all technical rew;c7w-Of the draft document to allow submittal of the Final Remedial Plan <br /> by January 11, 1991, She11 technical personnel have advised me that full technical review by Shell <br /> remediation engineers and hydrogeologisis can be accomplished by the end of January 1991, Therefo , <br /> re <br /> we are requesting that the draft Final Remedial Plan submittal date be changed from January 11, f orc <br /> to January 31, 1991. 1991 <br /> 1bL•,Lee Brennan,the former Delta Project Manager for this site no Ionger works for Delta. Mr.Henry <br /> Dihm 111,P.E.,has been assigned project management responsibilities for this project Please address <br /> any questions regarding data submitted to drte to either Mr.Dihm or me et(916)638-2085, <br /> Sincerely, <br /> DELTA ENVIRONMENTAL CONSULTANTS,INC <br /> Barbara J.Mickelson,P.E <br /> District Manager <br /> BJM:mjd <br /> Enclosure <br /> cc/enc: Mr.Jack Brastad,Shell Oil Company <br /> Mr.Henry Dihm,Delta Environmental Consultants, Inc. <br /> J, <br />(y <br />
The URL can be used to link to this page
Your browser does not support the video tag.