My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012563
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
3500 - Local Oversight Program
>
PR0544216
>
ARCHIVED REPORTS XR0012563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 1:33:30 AM
Creation date
3/4/2019 2:42:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012563
RECORD_ID
PR0544216
PE
3528
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
Stockton
Zip
95206
APN
16504007
CURRENT_STATUS
02
SITE_LOCATION
620 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
982
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> ' '00 <br /> ' i ^t :..,s.TM:�°'r �`o'.',..n.. a�• ''" N`�- � - �`'rte'''" w[ n , -�' 8'`,' <br /> a.. i`:-, <br /> a-_. <br /> a„ <br /> Adelta <br /> Environmental <br /> Consultants, inc. <br /> 3330 Data Drive.Suite 108 <br /> Rancho Cordova,CA 95670 <br /> 91&638-2085 <br /> FAX:9161638-8385 <br /> October 8,1990 <br /> Ms.Diane Lundquist <br /> Shell Oil Company <br /> Post Office Bax 4023 <br /> Concord,California 94524 <br /> Subject: Status Report <br /> 520 West Charter Way,Stockton,California <br /> Shell WIC No,204-7514-4305 <br /> Delta Project No.40.88 585 <br /> Dear Ms.Lundquist: <br /> Delta Environmental Consultants, Inc (Delta), has been authorized to conduct a hydrogeologic <br /> investigation which is intended to evaluate the presence or absence of petroleum hydrocarbon <br /> Constituents in soils and ground water beneath and adjacent to the above.referenced site (Figures 1 <br /> and 2). This report summarizes drilling activities,monitoring well installation', es <br /> performed <br /> an March 19 and 28, 1990 Results of ground water samples collected on July 31, 1990, are also <br /> c4niained within this reprnrt. <br /> Also included in this report is a summary of product recovery and interim remedial activities performed <br /> at the site to date and sou�—,e test data. Data in this report supplement information presented in the <br /> Delta report entitled HGroucol <br /> � Work <br /> August dated ' 1999,and <br /> hDelta letter <br /> rep <br /> Ireport entitled Soil and WrInve�rignon, dated March 61490. All fiedprocedures were <br /> conducted using methods described in Enclosure A <br /> Sell Barring Results <br /> On March 19, 1990,two additional soil borings were advanced to 40 feet below grade and completed <br /> as monitoring wells MW-8 and MW-9 (Figure 2). Soil boring 1095 containing soil descriptions are <br /> included in Enclosure B. Monitoring well specifications are included in Enclosure C Selected sail <br /> samples were submitted for chemical analysis of benzene,toluene,ethylbenzene,and xylenes (BMK), <br /> and total petroleum hydrocarbons as gasoline(TPh�. Soil sample analytical results for the March 19, <br /> 1990 drilling event are presented in Table 1. The cerlified analytical reports for soil samples collected <br /> during the March 1990 drilling event are included in Enclosure D. <br /> Practical Sotuluons to Environmental Concerns <br />
The URL can be used to link to this page
Your browser does not support the video tag.