Laserfiche WebLink
SOIL MANAGEMENT PLAN FOR TANK REPLACEMENT <br /> 620 West Charter Way, Stockton, California <br /> Delta Project No 40-88-586 <br /> Page 7 <br /> TABLE 3 <br /> Analytical Methods <br />' Anal is Method <br /> Fuel Tank and Product Line Samples <br />' TPHa 8015 (Modified) <br /> BTEXb 8020 <br />'j <br /> Waste Oil Tank Samples <br /> TPH (gasoline and diesel) 8015 (Modified) <br /> Oil and Grease 503 D & E <br /> BTEX 8020 <br /> Chlorinated Hydrocarbons 8010 <br /> t <br /> Metals (Cd, Cr, Pb, Zn) 8270 <br /> 'Total petroleum hydrocarbons <br /> bBenzene, toluene, ethylbenzene, xylenes <br /> 3.3 Soil Disposal Destinations <br /> Soils containing fewer than 100 ppm TPH will be transported to the Amador County Landfill in <br /> Ione, California Those soils determined as containing greater than 100, but fewer than 1,000 ppm TPH <br />' will be taken to Forward, Inc, in Stockton, California If results of composite sampling of the stockpiled <br /> soils reveals TPH concentrations exceeding 1,000 ppm, the soils containing over 1,000 ppm TPH will be <br />' manifested and transported to Petroleum Waste, Inc, in Buttonwillow, California, for disposal <br />' 4.0 SCHEDULE <br /> The work outlined in this plan will be initiated following approval from the San Joaquin Local Health <br /> District and in accordance with the schedule determined by Shell The report presenting the results of <br /> the work performed will be completed within 4 weeks following completion of the work, and following <br /> receipt of all laboratory reports to be generated by soil sampling and analytical activities <br /> 1 <br />