Laserfiche WebLink
SOIL MANAGEMENT PLAN FOR TANK REPLACEMENT <br /> 620 West Charter Way, Stockton, California <br /> Delta Project No 40-88-586 <br /> Page 8 <br /> 5.0 REMARKS SIGNATURES <br /> The recommendations contained in this report represent our professional opinions, and are based in part <br />' on information supplied by the client These opinions are based on currently available information and <br /> are arrived at in accordance with currently accepted hydrogeologic and engineering practices at this time <br /> and location Other than this, no warranty is implied or intended <br /> I <br /> DELTA ENVIRONMENTAL CONSULTANTS, INC. <br /> 1� <br /> e-t <br /> This report was prepared by e A (-,Lt,- Date j <br />' Erin Dougherty <br /> Geologist/Project Manager <br /> This report was reviewed by Date q s /89 <br /> Chris W Metzger, R <br /> 1 California Registered Geologist #4673 <br /> /cm Ir <br />' 42 <br /> cv � <br /> # 4673 <br /> CJ- <br /> AY; <br /> 1 <br />