My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
3500 - Local Oversight Program
>
PR0544217
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 11:52:48 PM
Creation date
3/4/2019 4:23:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544217
PE
3526
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
02
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gabriel Gonzalez [EH] <br /> From: Gabriel Gonzalez [EH] <br /> Sent: Friday, May 08, 2015 12:36 PM <br /> To: 'Daniel Villanueva' <br /> Cc: Nuel Henderson [EH] <br /> Subject: 701 E Charter Way, MW-10 <br /> Hi Daniel, <br /> This email is in response to our telephone conversation on May 5, 2015 regarding documentation of MW-10 installation <br /> being rescinded. <br /> Additional Monitoring Well Installation Work Plan Addendum dated March 25, 2008 includes proposals to install wells <br /> MW-5, MW-6, MW-10, and MW-11.Additional Monitoring Well Installation Work Plan Addendum dated June 10, 2008 <br /> includes a modification to MW-10's construction. Both of these work plans were responded to by the EHD in letter dated <br /> June 18, 2008, and included the approval to install MW-10. In January 2009, pertaining to the aforementioned work <br /> plans, the EHD issued a permit for the installations of MW-5, MW-6, and MW-11. <br /> I did not see any documentation of MW-10 being rescinded in our staff notes from the time the work plans were <br /> responded to and when the installation permits were issued. However, since an "MW-10" was not included on any <br /> permits, and given that there are no boring logs, well survey data, nor analytical data for an "MW-10" on Geotracker, it <br /> is reasonable to assume that an "MW-10" was never installed based on documentation available to the EHD. <br /> Sincerely, <br /> Gabriel Gonzalez, REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue <br /> Stockton, California 95205 <br /> Phone: (209) 468-3442 <br /> Email: gagonzalez@sicehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.