Laserfiche WebLink
' 20 December 2001 <br /> AGE-NC Project No 97-0326 <br />' Page 4 of 4 <br /> • Preparation of a work plan for aground water pumping test to assess groundwater extraction <br /> as a remedial option for this site <br />' On 02 and 07 November two CPT bonngs were advanced at the site to define help define the lateral <br /> and vertical extent of petroleum hydrocarbon-impacted ground water The results of the CPT <br /> investigation will be included in the next quarterly monitoring report <br /> 6.0 LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br />' analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available data <br /> points(ground water samples)and subsurface conditions may vary away from these data points No <br />' other warranty, expressed or rrnplied, is trade as to the professional recommendations contained in <br /> this report <br /> 1 <br /> 1 <br /> 1 <br /> Advanced GcoEnv=ronmentnl,Inc <br />