Laserfiche WebLink
�� .:� .�,� <br /> . r t -Rx .•'x'MWE#1 rn.»wa- �'� �7.+'o:"da�,x u'y _.,,''si "'3"A T `.£„^..p[, _ <br /> r q�- <br /> �ti✓ .ti4mc' - ,cy�b. -«Gry ,y+�Y'� H' �, '.'' 1 <br /> 1' <br /> FP <br /> This is to remove any light product which may have be introduced <br /> i into the well during drilling. Once this is removed deeper <br /> bailing may commence, No surging or introduction of surface <br /> water will be allowed into the well. <br /> Well measurements & sampling: <br /> The surface o;° the traffic box and the top of the casing will be <br /> surveyed using a surveyors level and rod. Assumed datum can be <br /> F used. The measurement of the depth to water can be made with <br /> measuring tape and water paste, or by use of an electrical <br /> measuring device. Measurement will be made to the nearest 100th <br /> Of a foot. Evidence of free product will be measured at the <br /> same time. Water, samples will be taken by a clean bailer <br /> decontaminated as described <br /> the surface of the standing water and aiummlediatelybpla edninear <br /> + VOA vile sealed placed in an ice chest and delivered to the lab <br /> �= within 48 hours. All measuring and sampling will be done at <br /> least 48 hours after the well has been developed. <br /> Material disposition: <br /> All material removed from the well will be stored and removed <br /> from the site in accordance with the County Health Departments <br /> instructions. <br /> Lk� <br /> € t <br /> } <br /> 3� <br /> t <br /> i� <br /> Irro <br /> 1' <br />