Laserfiche WebLink
11/28/89 12 20 $707 74 5581 KAPREALIAN ENG FILLNER CONST, Z 003 <br /> KEz-p99-1105 .W1 <br /> November 28, 1989 <br /> Page 2 <br /> 2 . Site prscripti <br /> The service station site occupies the northeast corner at <br /> the intersect Location Map and Siteant Plan Street kton, <br /> California. are attached� <br /> PROPOSED FIELD WORK <br /> PHASE 1 _ rUEld TANKPIT ExCAV T ON <br /> KEI proposes additional excavation of the fuel tank pit beneath <br /> 2ULN) , C(3LN} to the maximum <br /> sample points A(1UL5) , B( and D(4LN) <br /> excavation depth capability. Additional sampling will be <br /> performed to define the vertical extent of the soil contamina- <br /> tion. The undisturbed <br /> backhoe. <br /> ac�maple The will <br /> wine bee u <br /> lk <br /> delivered to <br /> material, excavat y <br /> a certified laboratory. <br /> After sampling, the fuel tank pit beneath sample points A(IULS) , <br /> B(2ULN) , C(3LN) and D(4LN) will be excavated to the depth of the <br /> additional pit bottom samples. All excavated soil will be <br /> stockpiled on-site for further sampling. <br /> KEY further proposes to define the lateral extent of contamina- <br /> tion by collecting tank pit sidewall s,xmples at an interval not <br /> to exceed one sample per 20 linear feet of original tank pit <br /> perimeter. The undisturbed samples will again be collected from <br /> bulk material excavated by backhoe as described above. <br /> After <br /> sampling, the tank <br /> it walls will be excavated laterally to the <br /> sample paints, withexcavated soil s ocj:p led on-site for further <br /> sampling. <br /> All tank pit bottom and sidewall sample; will be analyzed for TPH <br /> and <br /> as gasoline 1803) in 1 accordance ( with 8oan) , TEL JoaquinDHLocal�Health <br /> EDB (DHS ) <br /> District guidelines. 2 <br /> All excavated soil stockpiled on-Vne <br /> mill be sampled to deter <br /> composite sample will bre <br /> mine appropriate disposition- <br /> collected <br /> collected from each 50 cubic yaof stockpiled soil. Each <br /> compo sample will consist of two individual grab samples <br /> {,aken at various locations and depths from 1 to 2 feet,asiteand will <br /> samples <br /> be composited by the laboratory as one sample. Comp <br /> will be analyzed for TPH as gasoline and HTX&E. <br /> All excavated <br /> hazardous material, as determined by composite sample laboratory <br /> on- <br /> results, ) stint to a Class II disp <br /> will be sent to a Class I disposal site. A11 Osal <br /> hazardous excavated soil will be: l <br /> site, 2) retained on-site for aeration and re-sampling,' of 3) <br />