My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010652
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
3500 - Local Oversight Program
>
PR0544218
>
ARCHIVED REPORTS XR0010652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 11:22:50 AM
Creation date
3/5/2019 10:35:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010652
RECORD_ID
PR0544218
PE
3526
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
02
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA GEOPHYSICAL GROUP, INC. <br /> �"IO Box 578341, Modesto, CA 95357 Tel (209) 527-1247 <br /> f August 21, 1998 Fax (209) 527-4810 <br /> Public Health Services <br /> San Joaquin County ENVIRONMENTAL HEALTH DIVISION <br /> P O Box 388 304 E Weber Ave Third Floor <br /> Stockton, CA 95201 P O Box 388, Stoc on CA 95201.0388 <br /> Approved <br /> Denied ❑ <br /> RE Work Plan Conditions ��✓r.,w <br /> te <br /> Darpetro, Inc USA Service Station pa 4��' ..,! <br /> 749 E Charter Way -- , - 4 _bY_e'A1�,..0� <br /> Stockton, CA �r <br /> Site No 1060 <br /> On June 18, 1998, the EHD sent a letter requesting further work at this site On July 29, 1998 I <br /> met with Ms Carol Oz of the EHD on site to discuss future work This work plan will define the <br /> work <br /> In July 1997, we installed a vapor extraction system to remove the contamination from the vadose <br /> zone at this site To date approximately 33,900 pounds of gasoline have been removed, but there <br /> has been no great improvement of the groundwater contamination under the site Part of the <br /> reason is the fact that the water table has risen approximately 7 feet since January 1998, the <br /> water table is presently the highest it has been since January 1990 when we commenced working <br /> on this site See Figure 1 This rise in the water level has exposed the water to new <br /> contamination in the former vadose zone and has helped to keep the contamination levels high at <br /> this site <br /> The vapor extraction system is operating properly but it has not been able to remove all of the <br /> contamination In fact, much of the contamination is now below the water table where the vapor <br /> extraction system can not reach For this reason, we are planning to start an air sparging system <br /> in the old tank hole area where most of the contamination remains The sparging well was <br /> installed at the same time as the vapor extraction wells and is located in the tank hole area The <br /> sparging point is located 57 feet below the surface <br /> AIR SPARGING <br /> The air sparging system will introduce clean air into the aquifer about 23 feet below the surface of <br /> the water table The breakout pressure for the air is 10 to 11 PSI which is the pressure needed to <br /> overcome the pressure of the water column above the sparging point The well is constructed with <br /> Schedule 40 PVC pipe and it is recommended to operate at or below 15 PSI The air will be <br /> carried to the well head by a steel pipe which has a subsurface run of approximately 90 feet <br /> The sparging point is surrounded by vapor extraction wells which will capture the sparging air as it <br /> enters the vadose zone It is estimated that the sparging air will migrate about 15 feet away from <br /> the sparging point creating a sparging zone about 30 feet in diameter The capture radius of the <br /> extraction well has been found to be approximately 25 feet and the amount of air it processes is <br /> 200 cubic feet per minute The introduction rate of the sparging air will be 10 to 25 CFM This <br /> ' rate will not be too much air for the extraction system to handle See Figures 2 and 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.