Laserfiche WebLink
The soil will be tested as follows <br /> Tests Chemicals Detection Limits <br /> Soil EPA 8020 BTEX 5 ug/Kg <br /> Soil EPA 8015M TPH 1 mg[Kg <br /> The Health and Safety Plan will remain the same as in the previous Work Plans The attached <br /> protocols will be followed <br /> SCHEDULE <br /> The proposed schedule will be followed after the approval of this work plan is received and the site <br /> has been approved by the State UST Fund <br /> Obtain Permission from Pep Boys 4 weeks <br /> Drill and ConstructXWells 6 do&-Z(' w C 9,3 2 weeks <br /> Install Piping for Sparging System 3 weeks <br /> Install Sparging Equipment 2 weeks <br /> Develop, Survey and Sample 2 Monitonng Wells 1 week <br /> Commence Sparging System 1 week <br /> If there are any questions please contact me at 527-1247 <br /> Yours truly, <br /> f Z�RED G� <br /> � <br /> John Cussen F2 <br /> RG #6506 NQ• 6 <br /> Enclosures <br /> 5 Figures OF-CALIF P* <br /> 1 Protocol <br /> Cc Mr Roger Liston, Darpetro, Inc <br /> • <br />