Laserfiche WebLink
,, CALIFORNIA GEOPHYSICAL GROUP, INC. <br /> P O Box 578341, Modesto, CA 95357 Tel (209) 527-1247 <br /> May 7, 2001 <br /> Fax (209) 527-4810 <br /> Public Health Services =� <br />' San Joaquin County <br /> 304 East Weber Ave 3rd Floor <br /> Stockton, CA 95202 --- <br /> RE Quarterly Report April 2001 _ <br /> Darpetro, Inc USA Service Station <br /> 749 E Charter Way <br /> Stockton, CA <br />' Site No 1060 <br /> This site was sampled on April 24, 2001 Sherwood Labs of Hilmar, California analyzed <br /> the samples, their reports are attached <br /> Table 1 lists the history of the water table depths and elevations at this site since January <br /> 26, 1990 Table 2 lists the hydraulic gradients and bearings and Tables 3 and 3113 lists the <br />' analyses of the groundwater Table 5 lists the readings at the Vapor Extractor during <br /> operation and Table 6 lists the laboratory tests of the input and exhaust gasses and Table <br /> 7 lists the times of operation Sampling protocols are included <br /> FINDINGS <br /> The groundwater rose approximately 0 6 feet since the last quarterly monitoring event <br /> The gradient bearing is to the east The gradient is 0 0094 Ft/ft The attached hydraulic <br /> gradient plot shows the bearing of the gradient This quarter we measured all of the wells <br /> and sampled nine wells See Figure 1 <br /> The wells were purged with a decontaminated pump and the measured field parameters <br /> stabilized at the end of the purging Water samples were taken with a decontaminated <br /> bailer See Protocols Water samples were placed in appropriate glass containers with <br /> Teflon-lined seals <br />' The groundwater in wells 131M-1, BM-4, BM-5, BM-7, BM-9, BM-11 and BMA 3 were above <br /> California Drinking Water Standards for benzene Wells BM-9 and BM-7 are related to the <br /> contamination entering from the Arco Station to the west The benzene in well BMA 3 was <br />' possibly caused by the mounding of the groundwater near the vapor sparging well <br /> between BM-5 and BM-1 <br /> There are TPH levels in wells BM-1, BM-2, BM-5, BM-7, BM-9, BM-11 and BM-13 We <br /> believe the TPH levels in well BM-1, BM-5 and BMA 3 are caused by the air sparging <br /> The sparging point is located 50 feet below the surface and 20 feet below the water table <br /> The soil at this depth is very contaminated and the sparging has pushed the lower <br /> contamination to the water surface The contamination in BM-11 is perhaps a zone of <br /> water which migrated from one of the sites The water at BM-11 would take about 18 <br /> years to flow from our site to this well <br />