My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
814
>
3500 - Local Oversight Program
>
PR0544222
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 1:27:36 PM
Creation date
3/5/2019 11:46:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544222
PE
3528
FACILITY_ID
FA0005976
FACILITY_NAME
TIRE & WHEEL MASTERS
STREET_NUMBER
814
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16718101
CURRENT_STATUS
02
SITE_LOCATION
814 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOO <br /> DEPTH TO GROUNDWATER: <br /> Based upon the most recent sampling event, (July1,) groundwater is about 32' <br /> bgl. That is the highest level measured since monitoring began in October, <br /> 1992. <br /> PRIOR USE OF PROPERTY: The site had been used as a mini-mart and <br /> gasoline station for many years. It was taken out of service sometime in 1991 <br /> REVIEW OF PRIOR WORK DONE: <br /> Decenler, 1991 -Two (2) 5,000 gallon and one (1) 2,000 gallon UST's were <br /> removed from the property, along with a 500 gallon waste oil tank, dispenser <br /> pumps and product lines. <br /> March, 1992 - Earth Systems Environmental placed seven (7) soil borings on <br /> the property in an attempt to determine the extent of contamination discovered <br /> during tank removal operations. Refer to their report dated May 6, 1992 for <br /> details of that work. <br /> Septsmber, 1992 -The above company placed three (2) 2" groundwater <br /> monitoring wells on the property. The total depth of each well was 65', with the <br /> top of the well screens at 45' bgl. Refer to their report dated November 6, 1992 <br /> for more complete details of that work. <br /> March, April, & May, 1993 -The site of the removed UST's, product lines, and <br /> pump island were overexcavated by Jim Thorpe Oil, Inc., under the direction of <br /> Wm. J. Hunter, RG. A total of 750 cubic yards of contaminated soil was <br /> removed from the property, and the excavations filled with clean material. <br /> Details of that work are covered in the Wm. J. Hunter&Associates report dated <br /> June 30, 1993. <br /> WORKPLAN FOR PLACING TWO 2" GROUNDWATER MONITORING <br /> WELLS: <br /> The approximate location of the two wells is shown on PLATE !1111. Prior to <br /> mobilizing drilling equipment, an encroachment and revocable permit will be <br /> obtained from the City of Stockton for MW-4, which is proposed to be located in <br /> the area between the sidewalk and Grant Street. MW-5 is proposed to be <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.