My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011054
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
814
>
3500 - Local Oversight Program
>
PR0544222
>
ARCHIVED REPORTS XR0011054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 5:03:21 PM
Creation date
3/5/2019 1:38:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011054
RECORD_ID
PR0544222
PE
3528
FACILITY_ID
FA0005976
FACILITY_NAME
TIRE & WHEEL MASTERS
STREET_NUMBER
814
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16718101
CURRENT_STATUS
02
SITE_LOCATION
814 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We propose 3 samples from the pipeline trench. Samples will <br /> be taken at various locations along the length of the trench <br /> at the discretion of the SJPHS/EwHD representative on site. <br /> The number of $peal pile samples will be determined when an <br /> accurate estimate of quantity is made. Samples will be taken <br /> at the direction e:.f SJPHS/FHD repr"esent it xve on site. <br /> B. Temporary Fence A terilporary fence will be placed <br /> around the property until the excavation and trench are <br /> backfilled. <br /> E+ackf i l l inr-� will be done under <br /> �. Backfill <br /> City of Stockton building permit to City specifications. <br /> Backfill material will be whichever is appropriate for the <br /> desired condition. <br /> 10. Werk Schedule Werk can begin within 21 days of <br /> SJPHS/E:HD approval of this work plan. Sample analyses <br /> results sh-uld be ready for review within three weeks. <br /> 11. Health and <br /> Safety plan Attached. <br /> Respectfully submitted, <br /> JIM THORPE OIL., INC. <br /> dba "H-MIAI CON TRUCTIDN <br /> • Richard Thorpe <br /> Fres i dent a <br />
The URL can be used to link to this page
Your browser does not support the video tag.