Laserfiche WebLink
We propose 3 samples from the pipeline trench. Samples will <br /> be taken at various locations along the length of the trench <br /> at the discretion of the SJPHS/EwHD representative on site. <br /> The number of $peal pile samples will be determined when an <br /> accurate estimate of quantity is made. Samples will be taken <br /> at the direction e:.f SJPHS/FHD repr"esent it xve on site. <br /> B. Temporary Fence A terilporary fence will be placed <br /> around the property until the excavation and trench are <br /> backfilled. <br /> E+ackf i l l inr-� will be done under <br /> �. Backfill <br /> City of Stockton building permit to City specifications. <br /> Backfill material will be whichever is appropriate for the <br /> desired condition. <br /> 10. Werk Schedule Werk can begin within 21 days of <br /> SJPHS/E:HD approval of this work plan. Sample analyses <br /> results sh-uld be ready for review within three weeks. <br /> 11. Health and <br /> Safety plan Attached. <br /> Respectfully submitted, <br /> JIM THORPE OIL., INC. <br /> dba "H-MIAI CON TRUCTIDN <br /> • Richard Thorpe <br /> Fres i dent a <br />