Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> PROJECT DAME:Morita Brothers SAMPLE.ANALYSIS PERFORMED : TPH-Gas, B.T,X.E. <br /> $14 East ChaMw SAMPLe TIME: 10:00 <br /> Stockton, CA 9207 AMPLF_COWA;IN>ER(8): SUP'PLIeD BY LAB <br /> 2 VOA,s <br /> LAR ANALYSIS COMPLETED BY: SII-CRWOOD <br /> LIEN? HUNTER & ASSOCIATES DATE 10/03/93 <br /> PROJECT MANAGER BILL HUNTER SAMPLE LOCATION MW-1 <br /> AMPLER DON LIGHT START TIME 14 00 <br /> GROUNDWATER XXX 11VADOSE THER WELL HEAD P I D READING 0 0 PPM <br /> CASING ELEVATION (FEET MSL) ASING DIAMETER 2 INCH <br /> DEPTH TO WATER 51 20 FEET ALCULATED PURGE VOLUME 2 2 GAL <br /> DEPTH OF WELL 63 54 FEET 1ACTUAL VOLUME PER PURGE 2 0 GAL <br /> • TIME VOI UME phi I . ` `EMP. COLOR OTHEIrt <br /> Lallans -units I>maho km 06GAMS C (VISUM) <br /> 1436 0 68 1334 408 TURBID NO ODOR <br /> 2 71 1392 259 <br /> 4 72 1421 236 LT TURBID SLIGHT <br /> ODOR <br /> 6 72 1482 225 " <br /> 8 73 1492 223 <br /> PURGE METHOD GRUNDFOS 2" STAINLESS STEEL SUBMERSIBLE PUMP <br /> SAMPLE METHOD STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE DEPTH TO WATER AT SAMPLE TIME <br /> WELL INTEGRITY CAP AND SEAL ARE SECURE, LOCK IS INSTALLED <br /> REMARKS <br /> WEATHER CLEAR & HOT <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER & ALCONOX <br /> GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION WELL IS LOCATED ON THE SOUTH END OF LOT <br /> CONTAINMENT DO T 17 DRUMS <br /> . INSTRUMENTATION ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br /> RF,C9VF-0 <br />