Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> PROJECT NAME: Wrft Broffiers SAMPLE ANALYSIS PERFORMED , TPH-Gas,S.T.X.E, <br /> 614 East Okhartsr SAMPLE TIME: 10-,15 <br /> Stockton, OA 952017 SAMPLE CONTAINER S}: SUPPLIED BY LAB <br /> 2 V.O A.'s <br /> LAS ANALYSM COMPLETED BY., SHERWOOD <br /> CLIENT HUNTER & ASSOCIATES DATE 10/03/93 <br /> PROJECT MANAGER BILL HUNTER AMPLE LOCATION MW-2 <br /> AMPLER DON LIGHT TART TIME 15 30 <br /> GROUNDWATER XXX ADOSE THER WELL HEAD P I D READING 33 2 PPM <br /> CASING ELEVATION (FEET MSL) CASING DIAMETER 2 INCH <br /> DEPTH TO WATER 51 88 FEET CALCULATED PURGE VOLUME 1 97 GAL <br /> EPTH OF WELL 64 00 FEET [ACTUAL VOLUME PER PURGE 2 0 GAL <br /> • <br /> TIME VOLUMEpH EIC. ""EMF _ COLOR OTHER <br /> gall s units mshostom Deg s G (Visual) <br /> 1532 0 73 865 350 VERY TURBID ODOR <br /> 2 75 865 259 " <br /> 4 76 981 236 LT TURBID GAS ODOR <br /> 6 76 993 228 CLEAR " <br /> 8 75 995 222 " <br /> PURGE METHOD GRUNDFOS 2" STAINLESS STEEL SUBMERSIBLE PUMP <br /> SAMPLE METHOD STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE DEPTH TO WATER AT SAMPLE TIME <br /> WELL INTEGRITY CAP AND SEAL ARE SECURE, LOCK IS INSTALLED <br /> REMARKS TOP OF MONUMENT IS BROKEN NEW ASSEMBLY INSTALLED AND GROUTED <br /> UP <br /> WEATHER CLEAR & HOT <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER & ALCONOX <br /> GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION <br /> CONTAINMENT DO T 17 DRUMS <br /> INSTRUMENTATION ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br /> RECEIVED <br />