Laserfiche WebLink
SPILL PREVENTION,CONTROL AND COUNTERMEASURE DISCHARGE PREVENTION MEASURES,CONTROLS,AND <br /> PLAN(SPCC) COUNTERMEASURES <br /> Pacific Ethanol,Stockton. <br /> 6.12.4 Inspection of Aboveground Valves, Piping, and Appurtenances <br /> (112.8(d)(4)] <br /> Oil valves, fittings, and aboveground piping is routinely inspected and monitored during product transfers. <br /> Oil product tanks are equipped with visual fill tube and will be checked and monitored prior to and during <br /> unloading into storage tanks to prevent overfilling. <br /> Formal inspections are conducted monthly. <br /> 6.12.5 Protection of Aboveground Piping and Other Transfer Operations from <br /> Vehicular Traffic[112.8(d)(5)] <br /> All vehicles entering the Facility are warned through in-person communication, training, or visual warnings <br /> to not endanger aboveground piping or oil transfer operations. <br /> www,erm.com Project No,:0453993 Pacific Ethanol 28 September 2018 Page 28 <br />