Laserfiche WebLink
l Page 1 of 2 <br /> W <br /> Mike Infurna [EH] <br /> From : Art Deicke [adeicke@advgeoenv.com] <br /> Sent: Friday, July 23, 2010 4 :20 PM <br /> To: Mike Infurna [EH] <br /> Cc: Bob Marty; wlittle@advgeoenv.com; ngmplcs@pacbell .net <br /> Subject: RE: Status Report: Nomellini DPE System, 1045 West Charter Way, Stockton, CA <br /> Mr. Infurna, <br /> The blower for the DPE system at 1045 West Charter Way was repaired in the machine shop and a test-run was <br /> performed today. Unless the test-run fails, the plan is to pick up the blower on Tuesday at the repair shop in the <br /> Bay Area, as the repair shop is closed on Monday, then install the blower on Wednesday. <br /> I will let you know if the schedule changes. <br /> Thank you, <br /> Arthur Deicke <br /> Advanced GeoEnvironmental, Inc. <br /> Stockton • Santa Rosa • Monterey • Brea • Spokane • Reno <br /> 1 -800-511 -9300 <br /> adeicke( adv_geoenv.com <br /> www. advgeoenv . com <br /> This ernail message is for the sole use of the intendedrccipient( s) and may contain confidential and privileged information . <br /> Any unauthorized review, use, disclosure. or distribution of this email/fax is prohibited, If yon are not the intended recipient, <br /> please contact the sender by emaillfax and destroy all paper and electronic copies of the orio incl message. <br /> From : Art Deicke [mailto :adeicke@advgeoenv.com] <br /> Sent: Wednesday, June 30, 2010 1 : 31 PM <br /> To: 'Mike Infurna [EH]' <br /> Cc: Bob Marty; 'wlittle@advgeoenv.com'; 'ngmplcs@pacbell.net' <br /> Subject: Status Report: Nomellini DPE System, 1045 West Charter Way, Stockton, CA <br /> Mr. Infurna, <br /> As was reported to you in an email dated 02 June 2010, the blower motor on the DPE system malfunctioned . <br /> The bearings in the motor failed and scoured the shaft. <br /> The good news is that the manufacturer will warranty the blower. However, the estimated return time of the <br /> blower is 2 to 3 weeks from 6-25-2010, which was our last update. We expect the system to be back operational <br /> no later than 15 July 2010. <br /> Please let me know ifou have an questions, <br /> Y Yq , <br /> Thank you, <br /> Arthur Deicke <br /> 7/26/2010 <br />