Laserfiche WebLink
■■ t <br /> I t <br /> 30 July 2004 u <br /> AGE-NC Project No 95-0121 <br /> IPage 2 of 6 <br /> Temperature, pH and conductivity (field parameters) were measured for stabilization at regular <br /> purge-volume Intervals from each well using an Oakton water analyzer Field data and logs are L <br /> Included with Appendix A Purged ground water was containerized in Department of Transportation <br /> (DOT)or United Nations(UN)-approved 55-gallon steel drums and stored on-site In an area lacking <br /> general public access <br /> I2 2 FLOATING PETROLEUM PRODUCT REMOVAL <br /> I On 01 October 2003,approximately 0 37 feet offree-phase floating petroldum product was measured <br /> in well VW-1 utilizing a Solinst Interface Probe (Appendix B), thereafter, a clear, disposable <br /> polyethylene bailer was utilized at the well to remove floating petroleum product and ground water, <br /> Ibailing activities continued(approximately 5 gallons) until product could not be observed <br /> On 08 October 2003,approximately 0 34 feet of free-phase floating petroleum product was measured <br /> IIn well VW-1 utilizing a Solinst Interface Probe (Appendix B), thereafter, a clear, disposable <br /> polyethylene bailer was utilized at the well to remove floating petroleum product and ground water, <br /> bailing activities continued (approximately 6 gallons) until product could not be observed <br /> On 15 October 2003,approximately 0 18 feet of free-phase floating petroleum product was measured <br /> in well VW-1 utilizing a Solinst Interface Probe (Appendix B), thereafter, a clear, disposable <br /> polyethylene bailer was utilized at the well to remove floating petroleum product and ground water, <br /> bailing activities continued (approximately 4 gallons) until product could not be observed <br /> µOri 21 October 2003,approximately 0 20 feet of free-phase petroleum product was measured In well <br /> VW-1 utilizing a Solinst Interface Probe(Appendix B),floating petroleum product and groundwater <br /> I was removed from the well utilizing a clear,disposable polyethylene bailer Manual product removal <br /> (bailing) activities continued(approximately 2 gallons) until product could not be observed <br /> On 23 December 2003, approximately 0 06 feet of-free-phase petroleum product was measured in <br /> well VW-1 utilizing a Solinst Interface Probe(Appendix B), floating petroleum product and ground <br /> water was removed from the well utilizing a clear, disposable polyethylene bailer Manual product ;4 <br /> removal(bailing)activities continued(approximately 4 gallons)until product could not be observed ; <br /> The removal was performed in accordance with California Underground Storage Tank Regulations, <br />' Article 5, Section 2655 The free-phase petroleum product and purged ground water was stored on- <br /> site-in 55-gallon, DOT/UN-approved storage drums <br /> � r <br /> , 4 I <br /> Advanced Geo Ennronmental,Inc <br />