My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001102
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
3500 - Local Oversight Program
>
PR0544231
>
ARCHIVED REPORTS XR0001102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 3:51:13 PM
Creation date
3/6/2019 2:02:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001102
RECORD_ID
PR0544231
PE
3526
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
02
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 3 <br /> 03 August 1999 <br /> AGE-NC Protect No 95-0121 <br /> Page 7 of 7 <br /> date and sampler's Initials Appropnately sealed and labeled samples will be placed in a chilled <br /> container under ice and transported under chain-of-custody procedure to a microbiological <br /> laboratory <br /> 43 OXYGEN RELEASE COMPOUND PILOT TEST PROCEDURES <br />' Nine soil probe borings will be advanced to depths of 40 feet bsg utilizing a Geoprobe 5400 soil <br /> probing unit and spaced equidistant from well EW-1 Approximately 100 pounds of ORC will be <br /> infected Into each boring utilizing a Geoprobe grout pump Following ORC infection, all remaining <br /> soil boring void space will be backfilled with a portland cement <br /> Following ORC inoculation, a six month pilot test will be performed at the site to evaluate general <br /> aerobic conditions at the site as well as the effectiveness of ORC when applied to a petroleum- <br /> Impacted zone in saturated soil The ORC pilot test will consist of monitoring dissolved oxygen, <br /> pH and specific conductivity from EW-1 on a weekly basis using a YSi Model 55 Dissolved Oxygen <br /> Meter, monthly ground water samples will be collected from EW-1 and logged on a chain-of- <br /> custody form, placed in a chilled container and transported to a California Department of Health <br /> Services (DHS)-certified laboratory for analysis of <br /> • Total petroleum hydrocarbons quantified as gasoline and diesel (TPH-g and TPH-d, <br /> respectively) by EPA Method 8015 Modified, <br /> • Volatile aromatic compounds benzene, toluene, ethyl benzene and xylene (BTEX) with <br /> methyl-tertiary butyl ether(MTBE) by EPA Method 8020, and <br /> • Tertiary butanol (TBA), di-isopropyl ether (DIPS), ethyl tert butyl ether (ETBE),tert amyl <br /> methyl ether(TAME) and MTBE by EPA Method 8260 Modified <br /> • Dissolved Oxygen by EPA Method 360 1 <br /> , <br /> Advanced GeoEnuronmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.