Laserfiche WebLink
' TABLE OF CONTENTS _ <br />' Page <br /> 10 INTRODUCTION AND SCOPE OF WORK 1 <br />' 20 BACKGROUND 1 <br /> 21 SITE LOCATION 1 <br /> 22 UNDERGROUND STORAGE TANK REMOVAL 1 <br /> 23 SITE ASSESSMENT 2 <br /> 24 GROUND WATER DEPTH AND FLOW DIRECTION 2 <br />' 3.0 PROCEDURES 2 <br /> 31 MONITORING WELL PURGE PROCEDURES 2 <br />' 3 2 COLLECTION OF GROUND WATER SAMPLES 2 <br /> 40 FINDINGS 3 - <br />' 4 1 RELATIVE GROUND WATER ELEVATION AND GRADIENT 3 <br /> 4 2 ANALYTICAL RESULTS OF GROUND WATER SAMPLES 3 <br /> 50 CONCLUSIONS & RECOMMENDATIONS 3 <br /> 60 LIMITATIONS 4 <br />' LIST OF FIGURES <br /> Figure I -Location Map <br /> _ Figure 2 - Site Plan <br /> Figure 3 - Ground Water Elevation <br /> 0 <br /> ILIST OF TABLES <br /> Table I - Ground Watet Elevations <br /> Table 2 -Analytical Results of Gi ound Water Samples <br /> Table 3 -Analytical Results of Soil Samples _ <br /> 1 <br /> LIST OF APPENDICES <br /> Appendix A -Mofutornrg Well Data Sheets <br /> f Appendix B -Analytical Results,of Ground Water Samples <br /> 1 <br /> Jf <br /> f <br />