My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1145
>
2900 - Site Mitigation Program
>
PR0009298
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 4:57:42 PM
Creation date
3/6/2019 3:15:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0009298
PE
2960
FACILITY_ID
FA0004672
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
1145
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323012
CURRENT_STATUS
01
SITE_LOCATION
1145 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dillard Environmental Services <br /> 05/12/95 <br /> Page 4 <br /> Subject: Forward Inc. diesel fuel spill 05/12/95 <br /> 7:15A A. Reg on-site with S. Cox. Weather: clear no wind <br /> 7:30A Tailgate safety meeting. Discuss scope of work. Watch for moving trucks, equipment, <br /> employees while operating and moving equipment. Necessary P.P. E.: hard hat, safety <br /> glasses, gloves, rubber/ leather work boots, tyvek coverall. <br /> 7:40A Fuel equipment: 58 gallons into E1 15 gallons into B1 <br /> 7:50A Move temp s/p at A10 onto 6m <br /> 8:15A Continue dig at A5 s/p Al <br /> 8:OOA Carrie Fisher going to land fill. Will return @ noon to set up c/s for 2PM <br /> 8:OOA Charlie (f) with Armour Petroleum on site to pump product out of VTL1 into drums. S. <br /> Cox assisted for 20 min. <br /> 9:30A S. Cox leaves site <br /> 10:OOA Finish dig at A4 s/p Al <br /> 11:OOA Dig A8 s/p Al 0 <br /> 12:OOP Dig A6 s/p Al <br /> 12:30P Carrie Fisher calling agencies to do partial sample or reschedule sampling for 05/15 <br /> 2PM. Informed Carrie Fisher that our unit (E1) could not lift the empty fuel tank out of the <br /> secondary containment area. Option was given that either Dillard or Forward could make <br /> arrangements for a crane to lift the tank out so the contaminated soil could be excavated. <br /> Carrie Fisher will check into crane and advise. <br /> 1:OOP Begin dig A7 temp. s/p A7 <br /> 1:25P Charlie with Armour back for 2nd load. <br /> 2:40P E. Figueroa on site. Tailgate safety meeting. Discuss scope of work. Watch for moving <br /> trucks, equipment. Necessary P.P.E.: hard hat, safety glasses, gloves, rubber/ leather work <br /> boots, tyvek coverall. <br /> 2:45P Carrie Fisher calls Husky Crane Service. <br /> 2:50P Charlie with Armour finished pumping product out of VTL1 . 1 st load 660 gallons. 2nd <br /> load 694 gallons. Approximately 1 (45) gallons left in VTL1 along with sand, dirt, and debris. <br /> A. Reg signed shipping documents, secured VTL1 . <br /> 3:OOP Linda Turkatte with SJC Environmental Health on site. Will return 05/15 for sampling. <br /> Would like 2 hour notice prior to sampling. <br /> 3:15P Tarp s/p Al 0 with 4 mill (4m) poly visqueen. <br /> 4:20P Steve with Husky Crane Service on site to look at fuel tank. Set up tank removal for 6AM <br /> 05115/95. Dillard personnel need not be present for this. <br /> 4:30P Leave jobsite for Byron office. <br /> 5:30P Leave voice mail report as requested by Harlin Knoll, SJC Public Health Services @ <br /> 209-468-3442. <br />
The URL can be used to link to this page
Your browser does not support the video tag.