Laserfiche WebLink
3. The drilled areas shall be clearly marked. <br /> 4. Any soil staging area shall be marked, as needed. <br /> 5. Vehicle traffic shall not be allowed in equipment operating areas. <br /> 6. Unauthorized foot traffic shall not be allowed into the construction area. <br /> E. Emergency Procedures <br /> All field personnel shall comply with the following emergency procedures: <br /> 1. Safety standby equipment (include a first aid kit, fire extinguisher and a <br /> portable eye wash) shall be set up at the job site prior to the beginning of <br /> work. <br /> 2. All incidents shall be reported to the Field Supervisor immediately. <br /> 3. The Field Supervisor shall report incidents to the DEL TECH Project <br /> Manager. <br /> 4. Emergency response support including fire department and/or paramedic <br /> ambulance shall be requested as needed. (See Table 1.) <br /> 5. Emergency telephone numbers shall be indicated on Table 1. <br /> 7 <br />