Laserfiche WebLink
k" KL ElNFELDER <br /> 1. INTRODUCTION <br /> This is an Excavation Assessment Report prepared for the soil remediation conducted at the <br /> Independent Trucking Company facility in Stockton A fuel release occurred in May 1995 while <br /> fueling from one of two 10,000 gallon aboveground fuel storage tanks Approximately 500 cubic <br /> yards of diesel contaminated soil were initialIy excavated and removed from the site Based on <br /> the results of a soil boring investigation, Independent Trucking Company elected to excavate <br /> additional soil in order to obtain regulatory site closure from the California Regional Water <br /> Quality Control Board (CRWQCB) <br /> This report presents the observations of the additional soil excavation activities, results of <br /> chemical and forensic analyses, and recommendations for closure of the aboveground storage <br /> tank site 4 <br /> 1 <br /> r <br /> 23-482276-BOO/CR96S276 Page I of 11 October 17, 1996 <br /> Copynght 1996 Kleinfelder,Inc <br />