My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1145
>
3500 - Local Oversight Program
>
PR0544235
>
ARCHIVED REPORTS XR0000997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 7:01:52 PM
Creation date
3/6/2019 3:22:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000997
RECORD_ID
PR0544235
PE
3529
FACILITY_ID
FA0004672
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
1145
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323012
CURRENT_STATUS
02
SITE_LOCATION
1145 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to the four (4) wells recently placed on the <br /> property, there are at least 20 groundwater monitoring wells in <br /> the area The owners of the site immediately to the east at 1045 <br /> W Charter Way, (Nomellini Construction Co , ) have recently <br /> installed two (2) additional groundwater monitoring wells in <br /> order to further define an extensive hydrocarbon plume beneath <br /> that site . One of those wells has been placed on the east side <br /> of the Miles & Nolet property; it ' s location is shown on PLATE <br /> IV We have received some data concerning levels of contamina- <br /> tion, which revealed minor amounts of petroleum constituents . We <br /> have made arrangements with the owner of the Nomellini site to <br /> include that well in our quarterly sampling events . <br /> WORKPLAN FOR FURTHER SOIL & GROUNDWATER INVESTIGATION <br /> This proposed workplan consists of four phases, which will be <br /> described in detail later <br /> 1 A detailed review of aerial photographs of the area taken in <br /> 1963 , 1975, 1984, & 1990 . <br /> 2 A surface geophysical reconnaissance of the areas in and <br /> around the vicinity of the maantainance building and offices in <br /> the southwest corner of the property <br /> 3 "Push-type" soil probes to delineate the lateral limits of <br /> known contamination, and explore other possible anomalies that <br /> may be identified by the geophysical survey <br /> 4 Monitoring wells will be placed as necessary to fully define <br /> the extent of contamination revealed by prior work and this <br /> investigative phase. <br /> AERIAL PHOTOGRAPHIC REVIEW. <br /> We have obtained large scale prints of aerial photographs of the <br /> area taken in 1963 , 1975, 1984, & 1990 ; there are apparently no <br /> usable photos of the area prior to 1963 , and that one is of poor <br /> quality. They are being thoroughly examined in an attempt to <br /> determine if other UST' s or similar vessels existed in the area <br /> which have not yet been identified. A preliminary review reveals <br /> that the large maintainance building and office were present in <br /> 1963 , but there is no obvious evidence of any UST' s on the <br /> property or ad3acent sites . If further study indicates the <br /> presence of possible sources of contamination, we will conduct a <br /> more thorough investigation of those areas . <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.