Laserfiche WebLink
9 . Backfill Backfilling will be done by Jim <br /> Thorpe Oil personel . Backfill material will be whichever is <br /> appropriate for the desired final condition. <br /> 10 Work Schedule Work can begin within 14 days of <br /> SJPHS/EHD approval of this work plan Sample analyses <br /> results should be ready for review within 2 weeks <br /> 11 Health and Safety Plan Attached <br /> Respectfully submitted, <br /> JIM THORPE OIL, INC <br /> dba RICH-MART CONSTRUCTION <br /> Richard Thorpe <br /> President <br /> t <br /> 4 <br />