My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:50:45 PM
Creation date
3/6/2019 3:50:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> M Donna Heran, REHS <br /> 2 . ? 1868 East Hazelton Avenue <br /> c. -� PROGRAM COORDINATORS <br /> U) < Stockton, California 95205-6232 Robert McClellan, REHS <br /> Jeff Carruesco, REHS,RDI <br /> - i.' • Kasey Foley,REHS <br /> .. P Website: www.sjgov.org/ehd Linda Turkatte,REHS <br /> q�rFDRa Phone: (209) 468-3420 <br /> Fax: (209) 464-0138 <br /> January 31, 2013 <br /> Ms. Catherine Kahler Mr. George Betker <br /> J.M. Equipment Company, Inc. Geo Properties, Inc. <br /> 321 Spreckles Avenue 2306 Jackie Court <br /> Manteca, California 95336 Oakdale, California 95361 <br /> Subject: Former J.M. Equipment Company LOP Case No.: 9401 <br /> 1245 West Charter Way CUF No.:12607 <br /> Stockton, California 95206 GeoTracker ID No.: T0607700794 <br /> Dear Ms. Kahler and Mr. Betker: <br /> The San Joaquin County Environmental Health Department (EHD) has received and reviewed <br /> Corrective Action Placa (CAP), dated 12 December 2012, prepared and submitted by your <br /> consulting firm, Geological Technics, Inc. (GTI), on your behalf for the above-referenced site. <br /> The CAP was submitted in response to the EHD directive by letter dated 09 October 2012. <br /> In the CAP, GTI proposes to implement Phase II of the remedial action plan over a period of <br /> twelve to eighteen months which includes: <br /> • Installation of 10 injection wells (IW-5 through IW-14) screened between 15 and 25 feet <br /> below surface grade (bsg) at locations illustrated on Figure 4 of the CAP; <br /> • Installation of 3 monitoring wells (MW-11 through MW-13) screened between 15 and 35 <br /> feet bsg at locations illustrated on Figure 4 of the CAP; <br /> • Collection of soil samples at five-foot intervals for lithologic classification during the <br /> advancement of the initial boreholes during installation of proposed injection and <br /> monitoring wells followed by collection of soil samples at 10 and 20 feet bsg for field <br /> observation and chemical analysis for total petroleum hydrocarbons as gasoline (TPH-g) <br /> and benzene, toluene, ethylbenzene and total xylenes (BTEX) by a California certified <br /> laboratory; <br /> • Injection of between 7.5 and 12.5 percent hydrogen peroxide into the 14 proposed <br /> injection wells over a two-day period on a weekly basis for the first month, and twice <br /> monthly for the remaining eleven months of the year; <br /> • Submittal of an addendum to the CAP to implement air sparging as an auxiliary remedial <br /> method if site conditions limit hydrogen peroxide injection at specific wells or where <br /> contaminant concentrations are low; <br /> • Monthly measurement of dissolved oxygen (DO), oxygen-reduction potential (ORP) and <br /> pH in groundwater from observation well OW-1, monitoring wells MW 5, MW 6, MW 9, <br /> and proposed wells MW-11, MW-12 and MW-13 to monitor remediation; <br />
The URL can be used to link to this page
Your browser does not support the video tag.