Laserfiche WebLink
Proposed 2nd Quarter 2012 Activities <br /> It is anticipated that semi-annual groundwater monitoring and sampling of usually impacted <br /> groundwater monitoring well MW-4 will take place during the 2"d Quarter of 2012. <br /> It is also anticipated that a Phase I activities, including groundwater monitoring and sampling of <br /> the sites seven treatment zone, transition zone and compliance wells, will continue to take place <br /> during the 2"d Quarter of 2012. <br /> Limitations <br /> This report was prepared in accordance with the generally accepted standard of care and practice <br /> in effect at the time Services were rendered. It should be recognized that definition and <br /> evaluation of environmental conditions is an inexact science and that the state or practice of <br /> environmental geology/hydrology is changing and evolving and that standards existing at the <br /> present time may change as knowledge increases and the state of the practice continues to <br /> improve. Further, that differing subsurface soil characteristics can be experienced within a small <br /> distance and therefore cannot be known in an absolute sense. All conclusions and <br /> recommendations are based on the available data and information. <br /> The tasks proposed and completed during this project were reviewed and approved by the local <br /> regulatory agency for compliance with the law. No warranty, expressed or implied, is made. <br /> If you have any questions;please do not hesitate to call me at (209) 522-4119. <br /> Respectfully submitted, <br /> Raynold 1. Kablanow H, Ph.D. <br /> California Professional Geologist#5234 <br /> Certified Hydrogeologist#442 <br /> cc: Vicki McCartney- SJC PHS/EHD <br /> James Barton - CRWQCB-CVR <br /> USTCFP <br /> I"QMR 12 letter format 2 of 2 <br />